Katerra, the Menlo Park. Calif.-based technology company that specializes in prefabricated construction services, is expanding that portfolio through its acquisition of UEB Builders and Fortune-Johnson General Contractors (F-J).
UEB is a GC that specializes in commercial and residential projects such as multifamily, student housing, mixed use, and institutional. UEB can now tap into Katerra’s sales network that includes 11 offices in the U.S. (three of which are in Arizona) and one in Guadalajara, Mexico.
“Katerra reflects what we both believe in,” says Michael Hurst, a Principal at UEB Builders. “A shared desire to find a better way to build for our partners and their communities.” Prior to this merger, UEB had worked with Katerra on a number of projects, including Union South Bay, a 357-unit midrise apartment development under-construction in Carson, Calif.
F-J, founded in 1991, focuses primarily on multifamily construction, but also engages a variety of building types including high-density mixed-use communities, garden-style apartments, senior living, and student housing.
F-J was awarded the 2018 Multi-Family Builder of the Year by the National Association of Home Builders.
Katerra did not disclose the terms of these acquisitions, nor provide specifics about how the businesses would be integrated into its operations, expect to note that through these partnerships, Katerra would gain further construction expertise that will allow the company to expand its geographical footprint across the United States.
“Both companies share Katerra’s commitment to delivering increased value to customers by embracing technology and innovative methods,” says Michael Marks, CEO and co-founder of Katerra.
And given that Katerra owns four architecture firms, it can now present itself to clients as a full-service provider of manufacturing, design, engineering, and construction.
Katerra is focused on speed-to-market construction through such tools as digital technology, offsite manufacturing, and fully integrated building teams. For example, a garden-style multifamily building might take 140 days to complete via conventional construction. In Las Vegas, Katerra initiated K90, an R&D project where it built a 24-unit garden apartment in 90 days, from framing to delivery, leaning heavily on modular and prefabrication for such repetitive areas as bathrooms.
To see a video about K90, click here.
UEB and F-J fall under the oversight of Paal Kibsgaard, who last month joined Katerra as its COO, a new position for the company. Kibsgaard had been chairman and CEO of Schlumberger Ltd., an oilfield services company. He has also served on Katerra’s board for three year.
Kibsgaard is now responsible for Katerra’s U.S. operations, including architecture, engineering, manufacturing, and construction. Kibsgaard is also responsible for international expansion, and the development of new construction technologies.
Related Stories
| Mar 29, 2013
PBS broadcast to highlight '10 Buildings That Changed America'
WTTW Chicago, in partnership with the Society of Architectural Historians, has produced "10 Builidngs That Changed America," a TV show set to air May 12 on PBS.
| Mar 29, 2013
Shenzhen projects halted as Chinese officials find substandard concrete
Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted after inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand, which undermines building stabity.
| Mar 27, 2013
Small but mighty: Berkeley public library’s net-zero gem
The Building Team for Berkeley, Calif.’s new 9,500-sf West Branch library aims to achieve net-zero—and possibly net-positive—energy performance with the help of clever passive design techniques.
| Mar 27, 2013
RSMeans cost comparisons: college labs, classrooms, residence halls, student unions
Construction market analysts from RSMeans offer construction costs per square foot for four building types across 25 metro markets.
| Mar 26, 2013
Will Google Glass revolutionize the construction process?
An Australian architect is exploring the benefits of augmented reality in the design and construction process.
| Mar 22, 2013
8 cool cultural projects in the works
A soaring opera center in Hong Kong and a multi-tower music center in Calgary are among the latest cultural projects.
| Mar 22, 2013
Earn $500 as a DOE proposal reviewer
The DOE'S Building Technologies Office this morning put out a call to the AEC industry for expert reviewers for its new energy-efficiency initiative for small commercial buildings, which make up more than 90% of the commercial building stock.
| Mar 21, 2013
Turner report: Construction costs up slightly in first quarter
Turner Construction Company announced that the First Quarter 2013 Turner Building Cost Index – which measures costs in the non-residential building construction market in the United States – has increased to a value of 849. This reflects a 1.19% increase from the Fourth Quarter 2012 and a 3.41% increase from the First Quarter 2012.