flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Katerra’s new mass timber factory will produce the largest volume of CLT in North America

Industrial Facilities

Katerra’s new mass timber factory will produce the largest volume of CLT in North America

The factory recently opened in Spokane Valley, Wash.


By David Malone, Associate Editor | September 24, 2019

Photos courtesy Katerra

On Sept. 23, Katerra announced the grand opening of its 270,000-sf cross-laminated timber (CLT) factory. The facility will produce the largest volume of CLT in North America.

The new factory reflects Katerra’s technology-first approach and incorporates advanced geometric and biometric scanning of lamstock, an on-site kiln for precise moisture control, and artificial intelligence to further improve safety and reduce waste.

 

CNC Machine

 

“CLT perfectly embodies Katerra’s guiding principles for product development – it is technologically advanced, sustainable, and offers meaningful cost and time reductions,” said Michael Marks, CEO and Co-Founder, Katerra, in a release. “We have invested in creating the largest capacity CLT factory in North America because we believe deeply in the potential of CLT and want to see this great material advance to the mainstream.”

 

See Also: 'Catalyst' will be Washington’s first CLT office building

 

The factory occupies 29 acres in Spokane Valley, Wash., and provides easy access to rail lines and interstate highways. At full operation it will employ 105 people with an annual manufacturing capacity capable of providing thousands of apartments, student housing units, and more than 11 million square feet of floors and roofs. 

 

Glue process

 

Press

 

Pneumatic

 

Boards

Tags

Related Stories

Reconstruction & Renovation | Feb 7, 2018

Renovations begin on an underground facility that is investigating the nature of dark matter

This LEO A DALY-designed project makes way to produce the world’s most sensitive detector to this point.

Industrial Facilities | Jan 15, 2018

New Dollar General distribution center planned for Longview, Texas

The facility will be the discount retailer’s second in Texas and 17th overall.

Industrial Facilities | Jan 10, 2018

Kraft Heinz meat processing and packaging facility occupies 70 acre plot in Davenport, Iowa

The facility is the first Greenfield construction project for the Kraft Heinz Company since the merging of Kraft Foods Group and H.J. Heinz Company in 2015.

Giants 400 | Nov 2, 2017

Top 80 industrial construction firms

Walbridge, Jacobs, and Fluor top BD+C’s ranking of the nation’s largest industrial sector contractors and construction management firms, as reported in the 2017 Giants 300 Report.

Industrial Facilities | Nov 1, 2017

Top 45 industrial engineering firms

AECOM, Fluor, and CRB top BD+C’s ranking of the nation’s largest industrial sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

Giants 400 | Nov 1, 2017

Top 35 industrial architecture firms

Jacobs, Stantec, and BRPH top BD+C’s ranking of the nation’s largest industrial sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Multifamily Housing | Sep 20, 2017

New housing development rises from a historic textile mill’s ashes

Loft Five50 will add 137 housing units to Lawrence, Mass.

Industrial Facilities | Sep 13, 2017

TRUMPF’s ‘smart factory’ is a factory and showroom in one

The new facility is located in Hoffman Estates, Ill., not far from Chicago O’Hare International Airport.

Industrial Facilities | Aug 29, 2017

Clayco completes construction on Georgia-Pacific Distribution Center

The new facility expands on the company’s old distribution facility by over 300,000 sf.

Transportation & Parking Facilities | Aug 6, 2017

Post Panama Canal expansion, the top three U.S. ports still rule

But land constraints around the terminals are pushing asset prices and rents to new highs.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021