flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Katerra’s new mass timber factory will produce the largest volume of CLT in North America

Industrial Facilities

Katerra’s new mass timber factory will produce the largest volume of CLT in North America

The factory recently opened in Spokane Valley, Wash.


By David Malone, Associate Editor | September 24, 2019

Photos courtesy Katerra

On Sept. 23, Katerra announced the grand opening of its 270,000-sf cross-laminated timber (CLT) factory. The facility will produce the largest volume of CLT in North America.

The new factory reflects Katerra’s technology-first approach and incorporates advanced geometric and biometric scanning of lamstock, an on-site kiln for precise moisture control, and artificial intelligence to further improve safety and reduce waste.

 

CNC Machine

 

“CLT perfectly embodies Katerra’s guiding principles for product development – it is technologically advanced, sustainable, and offers meaningful cost and time reductions,” said Michael Marks, CEO and Co-Founder, Katerra, in a release. “We have invested in creating the largest capacity CLT factory in North America because we believe deeply in the potential of CLT and want to see this great material advance to the mainstream.”

 

See Also: 'Catalyst' will be Washington’s first CLT office building

 

The factory occupies 29 acres in Spokane Valley, Wash., and provides easy access to rail lines and interstate highways. At full operation it will employ 105 people with an annual manufacturing capacity capable of providing thousands of apartments, student housing units, and more than 11 million square feet of floors and roofs. 

 

Glue process

 

Press

 

Pneumatic

 

Boards

Tags

Related Stories

Giants 400 | Aug 19, 2022

2022 Giants 400 Report: Tracking the nation's largest architecture, engineering, and construction firms

Now 46 years running, Building Design+Construction's 2022 Giants 400 Report rankings the largest architecture, engineering, and construction firms in the U.S. This year a record 519 AEC firms participated in BD+C's Giants 400 report. The final report includes more than 130 rankings across 25 building sectors and specialty categories. 

Industrial Facilities | Jul 26, 2022

As industrial sector sizzles, investors watch impact of inflation and interest rates

Demand continues to top supply, especially on the coasts, according to latest CommercialEdge report.

Urban Planning | Jul 19, 2022

The EV charger station market is appealing to investors and developers, large and small

The latest entry, The StackCharge, is designed to make recharging time seem shorter.

Multifamily Housing | Jun 21, 2022

Two birds, one solution: Can we solve urban last-mile distribution and housing challenges at the same time?

When it comes to the development of both multifamily housing and last-mile distribution centers, particularly in metropolitan environments, each presents its own series of challenges and hurdles. One solution: single-use structures.

Self-Storage Facilities | May 19, 2022

A steady increase in new self-storage space is meeting growing need in large metros and their suburbs

Rent Café’s study projects a 9 percent bump in the nation’s existing inventory.

Adaptive Reuse | May 18, 2022

An auto plant in Detroit to get a retread as mixed-use housing

Fisher 21 Lofts could be the largest minority-led redevelopment in the city’s history.

Industrial Facilities | Apr 30, 2022

CapRock Partners taps into industrial space demand

The investment firm is committed to building 15 million sf of warehouses.

Industrial Facilities | Apr 14, 2022

JLL's take on the race for industrial space

In the previous decade, the inventory of industrial space couldn’t keep up with demand that was driven by the dual surges of the coronavirus and online shopping. Vacancies declined and rents rose. JLL has just published a research report on this sector called “The Race for Industrial Space.” Mehtab Randhawa, JLL’s Americas Head of Industrial Research, shares the highlights of a new report on the industrial sector's growth.

Industrial Facilities | Apr 6, 2022

Development underway for Missouri’s largest logistics park

Hunt Midwest envisions 27 buildings will be completed over the next 10 years.

boombox1
boombox2
native1

More In Category


Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021