flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KBE Building awarded Platinum STEP Award

KBE Building awarded Platinum STEP Award

STEP program provides analysis of safety and loss prevention programs, measure safety program improvements, and provide performance recognition.


By Posted by Tim Gregorski, Senior Editor | July 17, 2012
This article first appeared in the August 2012 issue of BD+C.

KBE Building Corp. recently received the Platinum STEP (Safety Training & Evaluation Process) Award from the national Associated Builders & Contractors (ABC).

The ABC National Environment Health & Safety Committee established the STEP program in 1989 to provide an analysis of safety and loss prevention programs, measure safety program improvements, and provide performance recognition. The STEP awards are separated into five categories: Bronze, Silver, Gold, Platinum, and Diamond.

The criteria for the Platinum STEP Award include:

  • A total recordable incident rate 25% or more below the NAICS (North American Industrial Classification) code industry average
  • A maintained Experience Modification Rate (EMR) of .800
  • No OSHA cited fatalities in the previous three years
  • A meeting of the minimum 20 Key Components Score

The ABC has honored KBE with either a Platinum or Gold STEP Award every year since 2003. +

Related Stories

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â