flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KBE Building wins honor for Armed Forces Reserve Center

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.


By Posted by Tim Gregorski, Senior Editor | June 27, 2012
The $54 million, 203,000-sf AFRC facility in Middletown, Conn.
The $54 million, 203,000-sf AFRC facility in Middletown, Conn.

KBE Building Corporation (KBE) (www.kbebuilding.com) earned a First Place Award for the Armed Forces Reserve Center (AFRC) at the 2012 Connecticut Building Congress (CBC) 16th Annual Project Team Awards Banquet in the category of Best New Project over $10 million.

The $54 million, 203,000-sf AFRC facility in Middletown, Connecticut encompasses a state-of-the-art training center, a vehicle maintenance facility, and a field equipment storage facility for the Connecticut National Guard and Army Reserve. KBE Building Corporation was the Design-Builder for the project in a joint venture with DeRita Construction Company, with Kleinfelder as the Architect of Record. The construction phase was completed in just 16 months, a remarkable achievement given the scope of work, which included the removal of nearly 500,000 cubic yards of soil and rock from the site. The new Reserve Center features numerous “green” building measures, including a “green” roof, photovoltaic arrays, and high-efficiency heating and cooling systems.

Previously, the Armed Forces Reserve Center project won Best in Show from Connecticut’s Associated Builders and Contractors, Inc., as well as the 2012 Engineering Excellence Grand Award from the American Council of Engineering Companies. +

Related Stories

| Sep 22, 2010

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

| Sep 22, 2010

Satellier, Potential + Semac close investment deal

Satellier, a world leader in providing CAD and Building Information Modeling (BIM) outsourced services to the architecture, engineering and construction industry, announces a strategic minority investment from India-based top engineering firm Potential + Semac, ushering in the next evolution of the global architecture support industry.

| Sep 21, 2010

New BOMA-Kingsley Report Shows Compression in Utilities and Total Operating Expenses

A new report from the Building Owners and Managers Association (BOMA) International and Kingsley Associates shows that property professionals are trimming building operating expenses to stay competitive in today’s challenging marketplace. The report, which analyzes data from BOMA International’s 2010 Experience Exchange Report® (EER), revealed a $0.09 (1.1 percent) decrease in total operating expenses for U.S. private-sector buildings during 2009.

| Sep 21, 2010

Forecast: Existing buildings to earn 50% of green building certifications

A new report from Pike Research forecasts that by 2020, nearly half the green building certifications will be for existing buildings—accounting for 25 billion sf. The study, “Green Building Certification Programs,” analyzed current market and regulatory conditions related to green building certification programs, and found that green building remain robust during the recession and that certifications for existing buildings are an increasing area of focus.

| Sep 21, 2010

Middough Inc. Celebrates its 60th Anniversary

Middough Inc., a top ranking U.S. architectural, engineering and management services company, announces the celebration of its 60th anniversary, says President and CEO, Ronald R. Ledin, PE.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021