flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kettering University’s new Learning Commons includes a student entrepreneur lab

University Buildings

Kettering University’s new Learning Commons includes a student entrepreneur lab

Stantec designed the project.


By David Malone, Associate Editor | February 20, 2020

Courtesy Stantec

The 105,000-sf Learning Commons at Kettering University will become a new academic hub for the school that includes collaboration spaces, a library, an auditorium, access points for information resources, dining facilities, and a student worker space that focuses on mobility and artificial intelligence.

The Stantec-designed space will include a Design and Entrepreneur Lab where students can meet, make, create, and explore. The space includes a two-story glass wall showcasing the Kettering student experience from the west entry. The Media Resource Center will offer support and resources to students including an IT Help Desk and Media Specialist Kiosks for assistance with material retrieval and education support. Meanwhile, the Gallery Connector will open up to four full stories through the open air atrium and is topped by a skylight that fills the interior space with natural light. 

 

See Also: Ciel Tower will be the tallest hotel in the world

 

The $63 million project also includes numerous sustainable features such as:

  • Upper floors that are turned above the lower floors to reorient the building to the primary north-south axis, setting a new geometric alignment while optimizing passive energy performance by allowing for solar control and orientation
  • Rooftop spaces and outdoor learning environments 
  • All primary mechanical and electrical equipment is located indoors to extend its operational life and to allow for the selection of high-performance equipment that can be easily maintained for optimal performance

The project is expected to be completed by spring 2022.

Related Stories

| Aug 7, 2012

Shedding light on the arts

Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.

| Aug 7, 2012

McCarthy tops out LEED Platinum-designed UCSD Health Sciences Biomedical Research Facility

New laboratory will enable UCSD to recruit and accommodate preeminent faculty.

| Jul 25, 2012

KBE Building renovates UConn dining hall

Construction for McMahon Dining Hall will be completed in September 2012.

| Jul 24, 2012

Military Housing firm announces expansion into student housing

The company has partnered with the military to build, renovate and manage nearly 21,000 homes with more than 65,000 bedrooms, situated on more than 10,000 acres of land nationwide.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 11, 2012

Perkins+Will designs new home for Gateway Community College

Largest one-time funded Connecticut state project and first designed to be LEED Gold.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021