flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

King County, Wash., addresses homelessness and COVID-19 with rapid-response site conversions

Coronavirus

King County, Wash., addresses homelessness and COVID-19 with rapid-response site conversions

The county is adding 2,500 beds within a dozen Assessment & Recovery Centers that DLR Group helped to design.


By John Caulfield, Senior Editor | April 5, 2020

King County, Wash., is converting warehouses and hotels, and building temporary structures on parking lots and sports fields, to quarantine people who, for whatever reason, can't quarantine themselves. Images: King County, Washington

About 18 months ago, officials from King County, Wash., which includes Seattle, approached DLR Group about developing housing solutions for the county’s homeless, who by one recent count totaled nearly 11,200, with just under half of those homeless unsheltered by conventional human habitude.

DLR Group, a national architecture and engineering firm, had been working on this project for a year when, on January 20, the first case of the coronavirus in the U.S. was reported in the state of Washington. As of April 4, Washington State’s Department of Health estimated that of the state’s 7,591 cases of illness and 310 fatalities attributed to COVID-19 infection, 2,898 cases and 200 deaths were in King County.

As part of its efforts to stem the virus’ spread, King County and DLR Group entered into an emergency contract. Working with the county and the builder Howard S. Wright (a division of Balfour Beatty), DLR Group developed a rapid-response solution to transform multiple sites into facilities equipped to quarantine patients who are incapable of self-quarantine, including the homeless.

The goal is to add 2,500 beds across 12 sites that range from converted motels and warehouses, to temporary structures built on parking lots and sports fields. As of this week, 800 beds will be online in four to six facilities, says Lori Coppenrath, DLR Group’s Justice and Civic Planner, who is spearheading this effort for her firm. She spoke with BD+C last Thursday.

Some of the temporary structures are huge tents, inside of which are barracks-like beds.

 

One of the county’s goals is to move people out of hospitals who aren’t critical but still need a safe, monitored environment to recover fully. Each of these Assessment and Recovery Centers is typically conceived, studied, built, and permitted within two weeks, to get patients into them quickly.

Testing for the virus is actually done offsite, says Coppenrath, to avoid infecting anyone in a Center who is not currently sick or has tested negative to COVID-19. In developing the concept for the Centers, the building team and county devised flow diagrams for how patients and staff would move through the Centers. Those diagrams incorporate transportation needs with defined drop-off/pick-up areas, parking, and emergency and fire accessibility.

Coppenrath says this project has been an exercise in overcoming barriers. “These Centers are like field hospitals, so you have to figure out how to offer basic services to people who might be there a month or longer.” The design includes storage that minimizes the potential for contamination from other patients’ property. The Centers also need to provide areas where people can wash their hands frequently and shower. The facilities must be ADA-accessible.

Some of the Assessment & Recovery Centers are ADA-compliant trailers, with individual living quarters that include kitchens, baths, and closet space.

 

Food services and waste management are essential. The Centers also have to give patients something to do while they’re quarantined. “We thought it would be a good idea to give each patient an iPad, so they could watch movies and TV, but then you have to figure out how to recharge them and provide WiFi.”

Finding materials and components on short notice can also be challenging: Coppenrath notes that bathroom/shower trailers are “just not available anymore.”

On a positive note, Coppenrath says that DLR Group has been able to call upon “different levels of leadership” to lift roadblocks and keep things moving forward. 

Related Stories

Coronavirus | Oct 2, 2020

With revenues drying up, colleges reexamine their student housing projects

Shifts to online learning raise questions about the value of campus residence life.

Coronavirus | Oct 1, 2020

The Weekly show: Decarbonizing Chicago, re-evaluating delayed projects, and the future of the jobsite

The October 1 episode of BD+C's "The Weekly" is available for viewing on demand.

Coronavirus | Sep 28, 2020

Cities to boost spending on green initiatives after the pandemic

More bikeways, car restrictions, mass transit, climate resilience are on tap.

Coronavirus | Sep 28, 2020

Evaluating and investing resources to navigate past the COVID-19 pandemic

As AEC firm leaders consider worst-case scenarios and explore possible solutions to surmount them, they learn to become nimble, quick, and ready to pivot as circumstances demand.

Coronavirus | Sep 24, 2020

The Weekly show: Building optimization tech, the future of smart cities, and storm shelter design

The September 24 episode of BD+C's "The Weekly" is available for viewing on demand.

Coronavirus | Sep 10, 2020

Mobile ordering is a centerpiece of Burger King’s new design

Its reimagined restaurants are 60% smaller, with several pickup options.

Coronavirus | Sep 9, 2020

Prefab: Construction’s secret weapon against COVID-19

How to know if offsite production is right for your project.

Coronavirus | Sep 3, 2020

The Weekly show: JLL's construction outlook for 2020, and COVID-19's impact on sustainability

The September 3 episode of BD+C's "The Weekly" is available for viewing on demand. 

Coronavirus | Sep 1, 2020

6 must reads for the AEC industry today: September 1, 2020

Co-working developers pivot to survive the pandemic, and the rise of inquiry-based learning in K-12 communities.

Coronavirus | Aug 28, 2020

7 must reads for the AEC industry today: August 28, 2020

Hotel occupancy likely to dip by 29%, and pandemic helps cannabis industry gain firmer footing.

boombox1
boombox2
native1

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021