flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KJWW Engineering Consultants acquires Michigan-based facilities engineering services firm

Engineers

KJWW Engineering Consultants acquires Michigan-based facilities engineering services firm

FES Group is particularly strong in the automotive industry.


By John Caulfield, Senior Editor | May 11, 2016

The KJWW Engineering Consultants division of IMEG Corp. has expanded its footprint in the state of Michigan by merging with FES Group, a facility engineering services and architectural firm based in Wixom, Mich., with 25 employees.

KJWW, based in Quad-Cities, Ill., was already one of the country’s largest engineering firms specializing in high-performance building systems, infrastructure, and construction-related services.

The acquisition comes seven months after KJWW and TTG Engineers merged and formed IMEG Corp., a holding company that owns both engineering firms, headquartered in the Quad-Cities. The two U.S.-based firms operate independently and have retained their original names. Together, they have a global footprint of nearly 1,000 employees. With the addition of FES Group, IMEG will have 26 national offices as well as six international locations, according to the Quad City Times.

The merger was finalized on May 1. Its terms were not disclosed.

FES’s services include Structural, Mechanical, and Electrical Engineering, Architectural Engineering, and BIM modeling. Its website says that FES operates a branch office in Auburn Hills, Mich., suburb of Detroit. Its primary markets include commercial, healthcare, R&D, and industrial. 

Paul VanDuyne, KJWW’s President, stated that the merger with FES Group gives his company a stronger presence in Michigan. He lauded FES’s technical prowess, attention to high-quality design, and client-centric focus. “FES Group’s strength in the automotive industry brings added value to KJWW’s extensive industrial and process portfolio and expertise.”

FES Group, which was formed in 2002, will operate as FES/KJWW, at least for now, and the Wixom office will remain open. Joe Droze, FES Group’s President, is staying on to run that office as a principal with KJWW. In a statement, Droze said he was impressed with KJWW’s reputation, national recognition for sustainable design, and education/training programs.

On the sustainable front, KJWW has engineered more than 150 LEED-certified projects in a wide range of sectors including aviation, corrections, education, entertaining, mission critical, science and technology, and sports and recreation.

Aside from its offices across the U.S., KJWW has locations in Dubai, India, and Lebanon.

Tags

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021