KLMK Group Inc. has been awarded the Project Management contract for the Emergency Department and Cardiology Expansion Project at Slidell Memorial Hospital in Slidell, La.
Slidell Memorial, an 182-bed acute care community hospital, is expanding their current facility. The renovation will include a 56,000-sf Emergency Room/Cardiology Expansion.
The new facility will allow for shorter wait times, faster assessments, quicker discharges and more inpatient private beds. In addition, it will allow Slidell to prepare for future community growth while adding new technologies, equipment and physicians.
“After issuing a Request for Proposal (RFP) and an extensive national search, KLMK Group provided the most comprehensive strategy and healthcare experience to assist in managing the construction of our expansion. We are confident that the expertise that KLMK brings to the project will ensure that Slidell Memorial achieves our goal of improving the quality of life in our community,” says Barry Winters, Director Materials Management at Slidell Memorial Hospital.
KLMK has been retained to provide program management services, from the design and preconstruction phase through transition, related to the renovation of the existing facility. “We value our relationship with Slidell Memorial and are excited about the opportunity to assist their team in expanding the services they deliver to the surrounding community,” stated Bill McMahon, KLMK President and COO.
Construction on the new facility is scheduled to begin in March 2012 and be completed by June 2013. BD+C
Related Stories
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.
| Feb 22, 2012
CISCO recognizes Gilbane for quality construction, design, and safety
The project employed more than 2,000 tradespeople for a total of 2.1 million hours worked – all without a single lost-time accident.
| Feb 14, 2012
The Jackson Laboratory announces Gilbane Building Co. as program manager for Connecticut facility
Gilbane to manage program for new genomic medicine facility that will create 300 jobs in Connecticut.
| Feb 13, 2012
WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold
Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.
| Feb 13, 2012
New medical city unveiled in Abu Dhabi
SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.
| Feb 10, 2012
Mortenson Construction research identifies healthcare industry and facility design trends
The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the importance of lean operations, flexible facility design, project delivery trends, improving patient experience, and evidence-based design.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.