flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kolbe adds 3-D models of direct set windows to BIM library?

Kolbe adds 3-D models of direct set windows to BIM library?


By By BD+C | October 24, 2011
Kolbe's Ultra Series Beveled Direct Set windows include LoE-270 insulating glass with argon gas.

Kolbe expanded its library of 2-D models and 3-D building information modeling (BIM) tools to include Ultra Series Beveled Direct Set windows. Complementing contemporary design projects, these durable, aluminum clad windows are glazed to the interior and direct set in the heavy-duty extruded aluminum frame.

The profile is integral to the frame, providing detail and strength. The new Revit and Google SketchUp models for Ultra Series Beveled Direct Set windows are located in Kolbe's online Architect Library. As part of Kolbe's growing collection of more than 1,000 window and door models, these new models can link with external data sources to instantly compile quantity takeoffs for residential and commercial building projects. These easy-to-use models allow users to customize the width, height, exterior trim, casement profiles, and other features.

A wide range of wood species is available including those certified by the Forest Stewardship Council (FSC). FSC-certified options can be coupled with energy efficient glass choices. Kolbe's Ultra Series Beveled Direct Set windows include LoE-270 insulating glass with argon gas. Due to the glass unit being set directly into the frame without a sash, these windows maximize the view and daylight. Plus, the detailed sticking allows for Kolbe's performance divided lite (PDL) options, grilles-in-the-airspace, or interior wood removable grilles.

The exterior aluminum clad frames contain recycled content, further supporting environmentally sensitive projects such as those pursuing recognition by Energy Star, Green Building Initiative's Green Globes, and the U.S. Green Building Council's LEED Rating System. The frames may be in a broad palette of distinctive colors aid in achieving eye-catching designs. Learn more about Kolbe's Direct Set window products and models at www.kolbe-kolbe.com. BD+C

Related Stories

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021