flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Kolbe adds 3-D models of direct set windows to BIM library?

Kolbe adds 3-D models of direct set windows to BIM library?


By By BD+C | October 24, 2011
Kolbe's Ultra Series Beveled Direct Set windows include LoE-270 insulating glass with argon gas.

Kolbe expanded its library of 2-D models and 3-D building information modeling (BIM) tools to include Ultra Series Beveled Direct Set windows. Complementing contemporary design projects, these durable, aluminum clad windows are glazed to the interior and direct set in the heavy-duty extruded aluminum frame.

The profile is integral to the frame, providing detail and strength. The new Revit and Google SketchUp models for Ultra Series Beveled Direct Set windows are located in Kolbe's online Architect Library. As part of Kolbe's growing collection of more than 1,000 window and door models, these new models can link with external data sources to instantly compile quantity takeoffs for residential and commercial building projects. These easy-to-use models allow users to customize the width, height, exterior trim, casement profiles, and other features.

A wide range of wood species is available including those certified by the Forest Stewardship Council (FSC). FSC-certified options can be coupled with energy efficient glass choices. Kolbe's Ultra Series Beveled Direct Set windows include LoE-270 insulating glass with argon gas. Due to the glass unit being set directly into the frame without a sash, these windows maximize the view and daylight. Plus, the detailed sticking allows for Kolbe's performance divided lite (PDL) options, grilles-in-the-airspace, or interior wood removable grilles.

The exterior aluminum clad frames contain recycled content, further supporting environmentally sensitive projects such as those pursuing recognition by Energy Star, Green Building Initiative's Green Globes, and the U.S. Green Building Council's LEED Rating System. The frames may be in a broad palette of distinctive colors aid in achieving eye-catching designs. Learn more about Kolbe's Direct Set window products and models at www.kolbe-kolbe.com. BD+C

Related Stories

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

New AIA report on embassies: integrate security and design excellence

The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.

| Aug 11, 2010

Section Eight Design wins 2009 Open Architecture Challenge for classroom design

Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021