flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KPF unveils design of Hong Kong University of Science and Technology campus

University Buildings

KPF unveils design of Hong Kong University of Science and Technology campus

The project will be built over two phases.


By David Malone, Associate Editor | April 1, 2021

All renderings courtesy KPF

Kohn Pedersen Fox (KPF) has recently unveiled the master plan of the Hong Kong University of Science and Technology (HKUST) campus. 

The project, located in Nansha, Guangzhou will span 11.6 million sf and accommodate more than 10,000 students and faculty. Space for housing, teaching and research, athletics, performing arts, and amenities, as well as a 24-hour library and state-of-the-art laboratories, will also be included. All of the spaces and facilities will converge around a dynamic central space meant to foster interdisciplinary collaboration and create a strong community.

 

HKUST exterior facilities

 

The design of the campus will combine HKUST’s programmatic aspirations with the site’s natural aesthetic, waterways, and urban context while targeting carbon neutrality and zero waste water. Three canals will embrace the delta and enforce the zero waste water goal, collecting and filtering rainwater for reuse and promoting resiliency through flooding and wetland protection. Within the canals’ borders, the campus will be free of emissions. A smart electric mobility network will support all transportation of resources and people.

The main outdoor collaboration areas and the buildings themselves will incorporate a combination of active and passive thermal comfort strategies to guarantee the well-being and enjoyment of occupants within the humid micro-climate of the site.

 

HKUST collaboration space

 

HKUST interior building space

 

HKUST green space

 

HKUST aerial

Related Stories

University Buildings | Jul 14, 2020

Cornell College partners with Johnson Controls to improve campus energy efficiency

The plan will reduce the college’s energy usage by 20%.

University Buildings | Jun 3, 2020

Renovation can turn older university buildings into high-performing labs

David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.

University Buildings | Jun 2, 2020

COVID-19 and teaching the next generation of nurses

COVID-19 hasn’t just upended healthcare delivery, the workplace, and all levels of education – the economic toll is still being realized – and capital projects on college and university campuses will inevitably be impacted as public and privately funded projects adjust to the budget crunch.

University Buildings | May 20, 2020

JCJ Architecture, Moody Nolan complete UCONN's Student Recreation Center

The project sits at the center of the Storrs campus.  

University Buildings | Apr 29, 2020

Dixie State University's new Human Performance Center

Hastings+Chivetta designed the project.

Coronavirus | Apr 10, 2020

COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients

COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients 

University Buildings | Apr 9, 2020

Designing for the next generation of student life: Academically aligned

Since many academic departments have been concentrated in their own buildings or portions of campus, bringing these disciplines into a shared facility is fairly new territory.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021