flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KSS Architects wins AIA NJ design award

KSS Architects wins AIA NJ design award


By By BD+C Staff | September 7, 2011
The $34 million, four-story, 107,000-sf campus center embodies the values of Lawrence University.

 

 

 

 

 

 

 

 

 

KSS Architects won a Merit Award for Warch Campus Center, Lawrence University, in the New Jersey chapter of the American Institute of Architects’ annual Design Awards Program. The project was one of three to win the award in the category of Architectural/Non-Residential. AIA NJ received about 60 submissions for its annual design competition.
The $34 million, four-story, 107,000-sf campus center embodies the values of the university.
It links academic and residential hubs on campus and provides a giant living room for students, faculty and staff. Visitors can move horizontally and vertically through the building to find a variety of places to eat, study and relax with friends. The building features the university’s main dining facilities, a cafe, campus and convenience stores, event rooms, student organization offices and a number of activity spaces including a theater and performance stage.
Warch Campus Center has received numerous design and sustainability awards and recognition, including LEED Gold certification from the USGBC, the first higher education building in Wisconsin to do so. The recognition is the second highest level in the U.S. Green Building Council’s Leadership in Energy and Environmental Design rating system for high-performance, sustainable buildings.
Uihlein-Wilson Architects, based in Milwaukee, was the project’s Architect-of-Record. BD+C

Related Stories

| Dec 6, 2011

Construction industry leaders gather for forum on diversity

Declared a “groundbreaking” event for the industry, Gilbane’s First Annual National Partners Council Forum addressed diversity and inclusion as well as building partnerships with minority, veteran, and women-owned businesses.

| Dec 6, 2011

Mortenson Construction completes Elk Wind Project in Iowa

By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power.

| Dec 6, 2011

?ThyssenKrupp acquires Sterling Elevators Services

The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America. 

| Dec 6, 2011

Vivenzio named vice president of building performance practice at Thornton Tomasetti’s New York Office

Vivenzio, a licensed architect in New York and New Jersey, has more than 28 years of experience in architectural project management, construction administration, building diagnostic services and forensic investigation.

| Dec 6, 2011

New office building features largest solar panel system in New Orleans

Woodward Design+Build celebrates grand opening of new green headquarters in Central City.

| Dec 5, 2011

New York and San Francisco receive World Green Building Council's Government Leadership Awards

USGBC commends two U.S. cities for their innovation in green building leadership.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021