flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KSS Architects wins AIA NJ design award

KSS Architects wins AIA NJ design award


By By BD+C Staff | September 7, 2011
The $34 million, four-story, 107,000-sf campus center embodies the values of Lawrence University.

 

 

 

 

 

 

 

 

 

KSS Architects won a Merit Award for Warch Campus Center, Lawrence University, in the New Jersey chapter of the American Institute of Architects’ annual Design Awards Program. The project was one of three to win the award in the category of Architectural/Non-Residential. AIA NJ received about 60 submissions for its annual design competition.
The $34 million, four-story, 107,000-sf campus center embodies the values of the university.
It links academic and residential hubs on campus and provides a giant living room for students, faculty and staff. Visitors can move horizontally and vertically through the building to find a variety of places to eat, study and relax with friends. The building features the university’s main dining facilities, a cafe, campus and convenience stores, event rooms, student organization offices and a number of activity spaces including a theater and performance stage.
Warch Campus Center has received numerous design and sustainability awards and recognition, including LEED Gold certification from the USGBC, the first higher education building in Wisconsin to do so. The recognition is the second highest level in the U.S. Green Building Council’s Leadership in Energy and Environmental Design rating system for high-performance, sustainable buildings.
Uihlein-Wilson Architects, based in Milwaukee, was the project’s Architect-of-Record. BD+C

Related Stories

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Nov 14, 2011

VanSumeren appointed to Traco general manager

VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco. 

| Nov 11, 2011

By the Numbers

What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 11, 2011

How Your Firm Can Win Federal + Military Projects

The civilian and military branches of the federal government are looking for innovative, smart-thinking AEC firms to design and construct their capital projects. Our sources give you the inside story.

| Nov 10, 2011

BD+C's 28th Annual Reconstruction Awards

A total of 13 projects recognized as part of BD+C's 28th Annual Reconstruction Awards.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021