flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KU Jayhawks take a gander at a P3 development

University Buildings

KU Jayhawks take a gander at a P3 development

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan.


By Peter Fabris, Contributing Editor | May 19, 2015
KU Jayhawks take a gander at a P3 development

The west entrance of the main campus of the University of Kansas with the Chi Omega Fountain. Photo: Quasselkasper via Wikimedia Commons

This article first appeared in the May 2015 issue of BD+C.

The P3 (public–private partnership) concept is getting a tryout at the University of Kansas, where state funding for construction has fallen from 20% of project costs to about 11% over the last 10 years, according to James Modig, KU’s University Architect and Director of Design and Construction Management.

Despite those cutbacks, the university has $352 million worth of building projects in design or under construction this year, up from $100–150 million annually in recent years, says Modig.

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan, the centerpiece of its 2014–2024 Campus Master Plan.

In addition to providing capital funds, the owner will maintain the building during the projected 30-year lease. With a $300 million maintenance backlog and an annual maintenance budget of only $9.4 million, having a developer assume maintenance costs will be a welcome innovation, says Modig.

Learn more about P3 and other creative project financing strategies in BD+C's Special Report, “How your firm can help struggling colleges and universities meet their building project goals.”

Related Stories

| Jun 8, 2012

Chestnut Hill College dedicates Jack and Rosemary Murphy Gulati complex

Casaccio Yu Architects designed the 11,300-sf fitness and social complex.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| May 31, 2012

2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College

Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.

| May 31, 2012

New School’s University Center in NYC topped out

16-story will provide new focal point for campus.

| May 31, 2012

Perkins+Will-designed engineering building at University of Buffalo opens

Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021