flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

KU Jayhawks take a gander at a P3 development

University Buildings

KU Jayhawks take a gander at a P3 development

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan.


By Peter Fabris, Contributing Editor | May 19, 2015
KU Jayhawks take a gander at a P3 development

The west entrance of the main campus of the University of Kansas with the Chi Omega Fountain. Photo: Quasselkasper via Wikimedia Commons

This article first appeared in the May 2015 issue of BD+C.

The P3 (public–private partnership) concept is getting a tryout at the University of Kansas, where state funding for construction has fallen from 20% of project costs to about 11% over the last 10 years, according to James Modig, KU’s University Architect and Director of Design and Construction Management.

Despite those cutbacks, the university has $352 million worth of building projects in design or under construction this year, up from $100–150 million annually in recent years, says Modig.

Kansas is in the RFP stage of its first P3 project, a new “gateway” housing facility that will be a key component of KU’s Central District Plan, the centerpiece of its 2014–2024 Campus Master Plan.

In addition to providing capital funds, the owner will maintain the building during the projected 30-year lease. With a $300 million maintenance backlog and an annual maintenance budget of only $9.4 million, having a developer assume maintenance costs will be a welcome innovation, says Modig.

Learn more about P3 and other creative project financing strategies in BD+C's Special Report, “How your firm can help struggling colleges and universities meet their building project goals.”

Related Stories

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021