flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A. Clippers unveil design for new Inglewood arena

Sports and Recreational Facilities

L.A. Clippers unveil design for new Inglewood arena

AECOM is designing the project.


By David Malone, Associate Editor | July 29, 2019

All renderings courtesy LA Clippers.

The Los Angeles Clippers have recently unveiled plans for a 26-acre basketball and entertainment complex. 

Located on West Century Boulevard, the Inglewood Basketball & Entertainment Center will include the team’s business and basketball offices, a training facility, and community and retail spaces, in addition to the arena. The building will have a three-dimensional oval design and will be clad in diamond-shaped metal panels inspired by the concept of a basketball swishing through a net. The panels will also provide solar benefit for energy efficiency.

Possibly the most striking elements of the design are the indoor/outdoor “sky gardens,” landscaped areas for food and beverage that will be accessible from every concourse level. A multipurpose plaza with a concert stage, community basketball courts, and space for the community to gather and watch everything from Clippers games to movie premieres on a supersized LED screen will also be included.

 

 

“We challenged the architects and designers on this project to create a landmark facility that exceeds current environmental standards and they have surpassed expectations,” said Chris Meany of Wilson Meany, the project’s developer. “The new Clippers arena demonstrates that environmental protection and economic development need not be mutually exclusive.”

 

See Also: L.A. Dodgers announce $100 million renovation plan for Dodger Stadium

 

AECOM is the project’s architect. Anderson Barker Architects and City Design Studio of Los Angeles designed the plaza buildings. Hood Studios provided landscape architecture services.

 

Related Stories

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021