flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Codes and Standards

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.


By Peter Fabris, Contributing Editor | January 14, 2020

Courtesy Pixabay

The completion of the $1 billion Metropolis development in downtown Los Angeles was aided by the city’s streamlined permitting process, according to the developer.

With the recent completion of the 56-story, 650-unit condominium tower Thea, the development provides 1,500 residences, 350 hotel rooms, and 70,000 sf of retail space. The 6.3-acre Metropolis project broke ground in 2014. Two residential towers, one in 2017 and one in 2018, as well as the Hotel Indigo, are already open.

The developer, Greenland USA, says Los Angeles Department of Buildings and Safety’s Parallel Design-Permitting Process helped it complete the project efficiently and on time. The program allows plan inspectors to check and identify elements that need correction during the conceptual design phase.

Among the benefits to the program:

· Reduces design revisions

· Earlier approvals from other agencies

· Reduced permit processing time

· Earlier starts for contractors   

· Cost savings from a shorter construction timeline

Related Stories

| Sep 15, 2011

New Label Established For Energy Efficient Doors in UK

The British Fenestration Ratings Council (BFRC) has established a labelling program for all types of domestic pedestrian doors. 

| Sep 15, 2011

EPA Releases New High-Rise Residential Energy Star Rating

The U.S. Environmental Protection Agency recently announced an Energy Star rating for multi-family high-rise buildings. 

| Sep 15, 2011

Bill Seeks To Spur Stronger Building Codes Nationwide

The Safe Building Code Incentive Act of 2011 would provide strong financial incentives for states to adopt and enforce strong building codes.  

| Sep 15, 2011

New Federal Law Limits Amount of Formaldehyde in Wood

President Obama signed into law legislation that limits the amount of formaldehyde in wood. The new measure will impact particle board and other composite wood products .

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 8, 2011

OSHA issues alert on incorrectly rebuilt circuit breakers

The Occupational Safety and Health Administration (OSHA) has issued a hazard alert, warning workers and employers of certain Eaton/Cutler-Hammer molded-case circuit breakers that were incorrectly rebuilt. 

| Sep 8, 2011

USGBC Streamlines LEED EB: O&M

The Council has reorganized the prerequisite and credit structure of LEED EB: O&M. 

| Sep 8, 2011

USGBC: 30 Legislative ‘Wins For Green Building’ So Far In 2011

A mid-year report by the U.S. Green Building Council says that there have been “30 legislative wins for green building” across 22 states in 2011. 

| Sep 8, 2011

Revised Building Codes Adopted After WTC Attacks Being Implemented

U.S. National Institute of Standards and Technology (NIST) code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction including One World Trade Center, the lead building of the new World Trade Center complex. 

| Sep 8, 2011

New Sustainability Standard Addresses Disaster Resistance

To aid local governments to adopt high-performance green building codes, the Portland Cement Association (PCA) and the Institute for Business and Home Safety (IBHS) have developed High Performance Building Requirements for Sustainability 2.0. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021