flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Free registration for selected "young superstars" for BD+C's Under40 Leadership Summit in San Francisco, Oct 9-11, 2013


By By Robert Cassidy, Editorial Director | Rob Cassidy | October 1, 2013

BD+C's 3rd Annual Under40 Leadership Summit is just days away (Oct 9-11), and we'd like to make this great career development and learning opportunity available to a few more worthy young (under age 40) superstars in the design and construction industry.

Thanks to the generosity of our sponsors - Andersen Windows + Doors, The Vinyl Institute, American Institute of Steel Construction (AISC), Benjamin Moore, and Nichiha - we can offer FREE registrations (a $495 value) to 3 more young AEC professionals.

All you need to do is get to San Francisco by the afternoon of Wed., Oct 9, for our exclusive tour of Autodesk Gallery, followed by an evening of fun and discussion with Art Gensler, founder of the world's largest architecture firm, and the start of our Vision U40 Competition - with $5000 in prizes at stake, led by Autodesk Fellow Tom Wujec.

All that, plus our premier tour of the Mission Bay/UCSF mixed-use healthcare district on Friday - and don't forget the famous BD+C "Marshmallow Challenge," where teams of U40s will battle to build the largest structure they can from 20 sticks of spaghetti and a marshmallow (first rule: you can't eat the marshmallow).

Want to join us? Contact me, Rob Cassidy, Editorial Director: rcassidy@sgcmail.com; 847-391-1040.

See you in the City by the Bay!

-Robert Cassidy, Editorial Director

Related Stories

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â