Today the STO Building Group and Layton Construction announced their intent for the nationally-ranked commercial construction firm to join the STO family of companies. The merger will allow both firms to leverage each other’s geographic reach to better serve clients with multiple locations and enhance the services and areas of expertise they can offer across that expanded footprint.
“Joining the STO family provides our customers greater support nationwide and our employees greater opportunities to grow professionally and personally. This is the next logical step in our evolution as a growing, successful company,” says David S. Layton, president and CEO of Layton Construction. “The alignment of both our cultures and our ability to adhere to our Layton Way was a driving factor—it allows us to capitalize on relationships nationwide and expand our areas of expertise while continuing to provide our customers with the predictable outcomes they have come to expect from Layton.”
Layton Construction is a nationally-ranked commercial contractor with proven experience in virtually every industry, including healthcare, retail, hospitality, manufacturing, distribution, education, office, industrial, detention, tenant improvement, and public facilities. Headquartered in Utah, the 1,000-person firm also has offices in Arizona, California, Colorado, Florida, Hawaii, Idaho, and Tennessee. Some of the company’s signature projects include the Eccles Theater in Salt Lake City, the Faena Forum in Miami, the University Hospital in San Antonio, the Montage Deer Valley in Park City, Rice-Eccles Stadium at the University of Utah, Monarch Beach Resort in Dana Point, Kapi’olani Medical Center in Honolulu, Koloa Landing on Kauai, Saint Alphonsus Medical Center in Boise, The Ritz-Carlton Paradise Valley, Nationwide Insurance Scottsdale, the Boise Airport, the Westdrift Hotel in Los Angeles, the Ae`o Tower in Honolulu, and Vanderbilt University Residential Towers in Nashville.
“Layton is a terrific addition to our family of companies,” says Robert Mullen, STO Building Group CEO. “Not only will their reach bring us into new areas of the country, but their expertise will enhance the services we can offer our clients, such as their extensive, national portfolio of projects in the healthcare and industrial sectors. Our ability to offer stock ownership to employees was another key factor in their decision. We are thrilled to have them join STO.”
Formerly operating as the Structure Tone Organization, STO recently restructured as the STO Building Group to provide a platform for growth that allows each of its member companies to maintain their cultural identity while leveraging the strengths of a multicompany organization. In the last three years, Canadian firm Govan Brown and US firms Ajax Building Company and BCCI Construction have merged with STO Building Group.
“Opportunities like this with Layton are the very reason we shifted our company structure to STO Building Group last year,” says James Donaghy, STO Building Group executive chairman. “We value the reputation and heritage of the firms who merge with our organization, and each has kept its name as a way to honor that legacy. As we continue to grow, we want to respect that history, but also reflect the collective expertise our companies offer and allow our employees to benefit from the larger organization’s resources.”
The merger is expected to be completed by the end of December 2019. Layton Construction will retain its name, logo, and cultural identity, and its current leaders will retain an ownership position in the organization and maintain their roles as the senior leadership team of the business. It is anticipated that new job opportunities will be created as a result of the merger to support the company’s projected growth for 2020 and beyond.
Related Stories
| Nov 2, 2010
A Look Back at the Navy’s First LEED Gold
Building Design+Construction takes a retrospective tour of a pace-setting LEED project.
| Nov 2, 2010
Wind Power, Windy City-style
Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.