flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lean, tech, talent training highlight contractor innovations

Contractors

Lean, tech, talent training highlight contractor innovations

From 5D estimating tools to interactive punch lists, the nation’s largest construction and construction management firms continue to push technology to gain an edge.


By David Barista, Editorial Director | September 5, 2018

HITT Contracting’s Co|Lab facility, set to open next summer, will be dedicated to testing products and ideas that will have a direct impact on the building industry. Designed by William McDonough + Partners, the cross-laminated timber (CLT) structure will serve as an exhibit, telling the story of mass timber buildings, living walls, and HITT’s application of VDC methodology and tools on the project. Courtesy HITT Contracting.

The latest developments at construction and construction management firms in 2017-18:

Bernards introduced market segment experts to lead the pursuit, management, and construction of all projects through “centers of excellence.” This has allowed a stronger focus on the pursuit process, which has resulted in a better “hit” rate on prospective projects.

Clark Group’s R&D team created Turnover Vision, an interactive punch list dashboard that provides real-time analysis of unit turnover status. The tool analyzes data from the project punch list and organizes it into interactive heat maps and graphs. “This Clark-developed solution enables our employees to spend more time communicating with clients and trade partners, completing punch list items and turning over units, rather than managing documents and printing reports,” according to the firm.

Cortland Partners outfitted a 60-foot-long trailer with a custom-designed classroom, including 46 feet of hands-on learning space, nine specialty training stations, and a video room. This mobile training unit allows the multifamily builder/designer/developer to deliver hands-on training to its employees across 11 states.

 

See also: Top 130 Contractor Firms - 2018 Giants 300 rankings 
See also: Top 80 Construction Management Firms - 2018 Giants 300 rankings
 

 

Project management firm Cumming launched two services: project controls and energy and sustainability. Its energy and sustainability team provides upfront auditing of its clients’ mechanical and electrical systems to ensure optimal efficiency. The project controls team uses automated reports and dashboards that illuminate key project metrics, which ultimately provide improved transparency on projects.

Fortis Construction is the only contractor in Oregon implementing the ConXtech Structural System, a chassis-based modular building system. For Kaiser Permanente’s new 90,000-sf Beaverton Medical Office Building, this solution provided early pricing guarantees during schematic design and day-one BIM model integration with improved accuracy of structural details. Fortis erected the entire structural system in just 12 days.

Gilbane is utilizing Triax Technologies’ Spot-R wearable, wireless communication devices to streamline project management. Spot-R tracks where work is happening, capturing time and attendance in real time. Heavy equipment can be tagged to ensure safety and operation by a certified worker.   

Haselden Construction developed a process that adds QR codes on equipment and door frames on projects, resulting in expedited issue resolution during punch list and the ability for the owner to proactively schedule maintenance upon construction completion. During punch list, once an issue is recorded, it coordinates all identified issues to everyone’s iPads, making tasks assignable and shareable.

HITT Contracting broke ground on Co|Lab, a space dedicated to testing products and ideas that will have a direct impact on the building industry. Designed by William McDonough + Partners, the cross-laminated timber (CLT) structure will serve as an exhibit, telling the story of mass timber buildings, living walls, and HITT’s application of VDC methodology and tools on the project. The contractor is looking to crowdsource ideas from existing design and construction partners, industry peers, and the public. Anticipated opening: summer 2019.

James G. Davis Construction is utilizing the last planner system (LPS) on a growing number of projects. LPS implements a series of scheduling and programming tactics, such as pull planning, to create and maintain buy-in at all levels at every stage in the construction process.

Kinsley Construction implemented 5D estimating software that allows estimators to visualize the project and confirm quantity takeoffs for any 3D model. The firm also uses 3D conceptual modeling/estimating software that creates detailed “rough order of magnitude” estimates by assigning costs to the 3D geometry. It allows teams to perform cost analysis and explore site selection, development concepts, and building layout in a single meeting.

Linbeck Group applies Lean principles to all work processes. Within the past 18 months, its War On Waste (WOW) program has published more than 50 videos demonstrating how its teams eliminate waste through process changes.      

Messer Construction has made steps to improve its safety performance through Lean daily management. Based on the collection and analysis of jobsite metrics, the firm created an action plan for the use of gloves on the jobsite. It required all Messer sites to implement 100% gloves at all times, starting October 2017. Hand injuries have dropped by 69% since then.

Two years after its launch, PCL Construction Enterprises’ PartsLab—a free Autodesk Revit addition that streamlines the management of design data for GCs—has been downloaded 1,500 times and has more than 370 registered users.

Pepper Construction Group has increased its investment in virtual and augmented reality workflows, leveraging the technology in the field. The impacts have been immediate and impressive. For instance, when used early on projects, AR/VR has replaced physical mock-ups, resulting in savings of $100,000 or more on a single project and reducing the overall project costs by driving earlier informed decisions.

Robins & Morton is executing its largest offsite/prefab project to date. For the new $255 million Shawn Jenkins Children’s Hospital at the Medical University of South Carolina, in Charleston, the firm built a 80,000-sf prefabrication warehouse, where all project trades are working together in a controlled environment to provide just-in-time materials delivery.

Rogers-O’Brien Construction has integrated collaborative project planning (CPP) into its preconstruction services. The goal of CPP is to proactively impact project costs and schedule by reducing the number of potential RFIs required to clarify design intent. It focuses on engaging with the design team, its consultants, and the owner immediately and intensely after the firm’s selection.

S.M. Wilson created a two-year leadership program to serve as a development tool for succession planning and retention, and to provide greater interaction and access to the current executive team. The firm also revised its onboarding process for new employees to include one year of mentoring, training, rotation through preconstruction and estimating, and field experience.

Skanska is exploring the integration of estimating, modeling, and virtual reality. Using a custom Revit Takeoff Template, the firm extracts material quantities using 3D models and then loads the model and cost information into VR (via the HTC Vive) to create immersive, first-person experiences for customers. By connecting design and material options with cost in VR, Skanska can enhance stakeholder understanding and improve real-time decision-making.

Skender published a report, “101 Ways to Build Smarter,” which provides insights from more than six decades of construction work. Among the 101 ideas:

• Lock in pricing: In an inflationary environment, lock in materials and equipment costs as soon as possible. As prices escalate, it often pays off to pre-purchase materials to avoid price hikes.

• Build lighter and smarter: Sometimes owners ask for materials and equipment that are larger or more powerful than the anticipated use requires.

• Go Lean: Focus on reducing wasted materials, time, and labor costs.

Among Turner Construction’s wide range of VR/AR applications, the firm created a safety education tool that uses a VR environment to provide immersive training for staff members and partners.

W.M. Jordan Company transformed its Project Executive leadership program to focus on Millennial development. It incorporated leadership programs from Harvard University, Wharton School at the University of Pennsylvania, and Stanford University.

Wight & Co. uses a proprietary approach, called SPARK Sessions, to help clients accelerate the design and development of their projects. This interdisciplinary, collaborative process engages teams, as well as the appropriate expertise within Wight & Co., during the earliest stages of a project.

Related Stories

MFPRO+ News | Sep 24, 2024

Major Massachusetts housing law aims to build or save 65,000 multifamily and single-family homes

Massachusetts Gov. Maura Healey recently signed far-reaching legislation to boost housing production and address the high cost of housing in the Bay State. The Affordable Homes Act aims to build or save 65,000 homes through $5.1 billion in spending and 49 policy initiatives.

AEC Tech | Sep 24, 2024

Generative AI can bolster innovation in construction industry

Jeff Danley, Associate Technology and Innovation Consultant at Burns & McDonnell, suggests several solutions generative AI could have within the construction industry.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

3D Printing | Sep 17, 2024

Alquist 3D and Walmart complete one of the nation’s largest free-standing, 3D-printed commercial structures

Walmart has completed one of the largest free-standing, 3D-printed commercial structures in the US. Alquist 3D printed the almost 8,000-sf, 20-foot-high addition to a Walmart store in Athens, Tenn. The expansion, which will be used for online pickup and delivery, is the first time Walmart has applied 3D printing technology at this scale. 

Retail Centers | Sep 17, 2024

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?

Government Buildings | Sep 17, 2024

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

Codes and Standards | Sep 17, 2024

New California building code encourages, but does not mandate heat pumps

New California homes are more likely to have all-electric appliances starting in 2026 after the state’s energy regulators approved new state building standards. The new building code will encourage installation of heat pumps without actually banning gas heating. 

Codes and Standards | Sep 17, 2024

ASHRAE’s first group of certified decarbonization professionals announced

ASHRAE recently announced its inaugural cohort of Certified Decarbonization Professionals (CDPs). Individuals who earned this designation demonstrate competency to assess, analyze, and develop effective and sustainable strategies to reduce or eliminate the life-cycle carbon footprint of buildings. 

Mass Timber | Sep 17, 2024

Marina del Rey mixed-use development is L.A.’s largest mass timber project

An office-retail project in Marina del Rey is Los Angeles’ largest mass timber project to date. Encompassing about 3 acres, the 42XX campus consists of three low-rise buildings that seamlessly connect with exterior walkways and stairways. The development provides 151,000 sf of office space and 1,500 sf of retail space.

Education Facilities | Sep 16, 2024

Hot classrooms, playgrounds spur K-12 school districts to go beyond AC for cooling

With hotter weather occurring during the school year, school districts are turning to cooling strategies to complement air conditioning. Reflective playgrounds and roads, cool roofs and window films, shade structures and conversion of asphalt surfaces to a natural state are all being tried in various regions of the country. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021