flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Lean, tech, talent training highlight contractor innovations

Contractors

Lean, tech, talent training highlight contractor innovations

From 5D estimating tools to interactive punch lists, the nation’s largest construction and construction management firms continue to push technology to gain an edge.


By David Barista, Editorial Director | September 5, 2018

HITT Contracting’s Co|Lab facility, set to open next summer, will be dedicated to testing products and ideas that will have a direct impact on the building industry. Designed by William McDonough + Partners, the cross-laminated timber (CLT) structure will serve as an exhibit, telling the story of mass timber buildings, living walls, and HITT’s application of VDC methodology and tools on the project. Courtesy HITT Contracting.

The latest developments at construction and construction management firms in 2017-18:

Bernards introduced market segment experts to lead the pursuit, management, and construction of all projects through “centers of excellence.” This has allowed a stronger focus on the pursuit process, which has resulted in a better “hit” rate on prospective projects.

Clark Group’s R&D team created Turnover Vision, an interactive punch list dashboard that provides real-time analysis of unit turnover status. The tool analyzes data from the project punch list and organizes it into interactive heat maps and graphs. “This Clark-developed solution enables our employees to spend more time communicating with clients and trade partners, completing punch list items and turning over units, rather than managing documents and printing reports,” according to the firm.

Cortland Partners outfitted a 60-foot-long trailer with a custom-designed classroom, including 46 feet of hands-on learning space, nine specialty training stations, and a video room. This mobile training unit allows the multifamily builder/designer/developer to deliver hands-on training to its employees across 11 states.

 

See also: Top 130 Contractor Firms - 2018 Giants 300 rankings 
See also: Top 80 Construction Management Firms - 2018 Giants 300 rankings
 

 

Project management firm Cumming launched two services: project controls and energy and sustainability. Its energy and sustainability team provides upfront auditing of its clients’ mechanical and electrical systems to ensure optimal efficiency. The project controls team uses automated reports and dashboards that illuminate key project metrics, which ultimately provide improved transparency on projects.

Fortis Construction is the only contractor in Oregon implementing the ConXtech Structural System, a chassis-based modular building system. For Kaiser Permanente’s new 90,000-sf Beaverton Medical Office Building, this solution provided early pricing guarantees during schematic design and day-one BIM model integration with improved accuracy of structural details. Fortis erected the entire structural system in just 12 days.

Gilbane is utilizing Triax Technologies’ Spot-R wearable, wireless communication devices to streamline project management. Spot-R tracks where work is happening, capturing time and attendance in real time. Heavy equipment can be tagged to ensure safety and operation by a certified worker.   

Haselden Construction developed a process that adds QR codes on equipment and door frames on projects, resulting in expedited issue resolution during punch list and the ability for the owner to proactively schedule maintenance upon construction completion. During punch list, once an issue is recorded, it coordinates all identified issues to everyone’s iPads, making tasks assignable and shareable.

HITT Contracting broke ground on Co|Lab, a space dedicated to testing products and ideas that will have a direct impact on the building industry. Designed by William McDonough + Partners, the cross-laminated timber (CLT) structure will serve as an exhibit, telling the story of mass timber buildings, living walls, and HITT’s application of VDC methodology and tools on the project. The contractor is looking to crowdsource ideas from existing design and construction partners, industry peers, and the public. Anticipated opening: summer 2019.

James G. Davis Construction is utilizing the last planner system (LPS) on a growing number of projects. LPS implements a series of scheduling and programming tactics, such as pull planning, to create and maintain buy-in at all levels at every stage in the construction process.

Kinsley Construction implemented 5D estimating software that allows estimators to visualize the project and confirm quantity takeoffs for any 3D model. The firm also uses 3D conceptual modeling/estimating software that creates detailed “rough order of magnitude” estimates by assigning costs to the 3D geometry. It allows teams to perform cost analysis and explore site selection, development concepts, and building layout in a single meeting.

Linbeck Group applies Lean principles to all work processes. Within the past 18 months, its War On Waste (WOW) program has published more than 50 videos demonstrating how its teams eliminate waste through process changes.      

Messer Construction has made steps to improve its safety performance through Lean daily management. Based on the collection and analysis of jobsite metrics, the firm created an action plan for the use of gloves on the jobsite. It required all Messer sites to implement 100% gloves at all times, starting October 2017. Hand injuries have dropped by 69% since then.

Two years after its launch, PCL Construction Enterprises’ PartsLab—a free Autodesk Revit addition that streamlines the management of design data for GCs—has been downloaded 1,500 times and has more than 370 registered users.

Pepper Construction Group has increased its investment in virtual and augmented reality workflows, leveraging the technology in the field. The impacts have been immediate and impressive. For instance, when used early on projects, AR/VR has replaced physical mock-ups, resulting in savings of $100,000 or more on a single project and reducing the overall project costs by driving earlier informed decisions.

Robins & Morton is executing its largest offsite/prefab project to date. For the new $255 million Shawn Jenkins Children’s Hospital at the Medical University of South Carolina, in Charleston, the firm built a 80,000-sf prefabrication warehouse, where all project trades are working together in a controlled environment to provide just-in-time materials delivery.

Rogers-O’Brien Construction has integrated collaborative project planning (CPP) into its preconstruction services. The goal of CPP is to proactively impact project costs and schedule by reducing the number of potential RFIs required to clarify design intent. It focuses on engaging with the design team, its consultants, and the owner immediately and intensely after the firm’s selection.

S.M. Wilson created a two-year leadership program to serve as a development tool for succession planning and retention, and to provide greater interaction and access to the current executive team. The firm also revised its onboarding process for new employees to include one year of mentoring, training, rotation through preconstruction and estimating, and field experience.

Skanska is exploring the integration of estimating, modeling, and virtual reality. Using a custom Revit Takeoff Template, the firm extracts material quantities using 3D models and then loads the model and cost information into VR (via the HTC Vive) to create immersive, first-person experiences for customers. By connecting design and material options with cost in VR, Skanska can enhance stakeholder understanding and improve real-time decision-making.

Skender published a report, “101 Ways to Build Smarter,” which provides insights from more than six decades of construction work. Among the 101 ideas:

• Lock in pricing: In an inflationary environment, lock in materials and equipment costs as soon as possible. As prices escalate, it often pays off to pre-purchase materials to avoid price hikes.

• Build lighter and smarter: Sometimes owners ask for materials and equipment that are larger or more powerful than the anticipated use requires.

• Go Lean: Focus on reducing wasted materials, time, and labor costs.

Among Turner Construction’s wide range of VR/AR applications, the firm created a safety education tool that uses a VR environment to provide immersive training for staff members and partners.

W.M. Jordan Company transformed its Project Executive leadership program to focus on Millennial development. It incorporated leadership programs from Harvard University, Wharton School at the University of Pennsylvania, and Stanford University.

Wight & Co. uses a proprietary approach, called SPARK Sessions, to help clients accelerate the design and development of their projects. This interdisciplinary, collaborative process engages teams, as well as the appropriate expertise within Wight & Co., during the earliest stages of a project.

Related Stories

| Nov 2, 2010

A Look Back at the Navy’s First LEED Gold

Building Design+Construction takes a retrospective tour of a pace-setting LEED project.

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021