flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Leo A Daly designs mental health clinic for veterans in Tampa

Healthcare Facilities

Leo A Daly designs mental health clinic for veterans in Tampa

The new facility will consolidate all mental health services the VA offers into one clinic.


By David Malone, Managing Editor | December 16, 2021
Leo A Daly VA mental health hospital exterior
Images courtesy Leo A Daly

Leo A Daly has completed the design for a new mental health clinic for veterans in Tampa, Fla.

The 144,000-sf clinic will combine three existing VA services currently being offered on and off the James A. Haley Veterans’ Hospital’s main campus. The project will consolidate an existing rehab and recovery center, a 60-bed inpatient domiciliary, and a residential treatment program for veterans who are homeless or at risk of becoming homeless, integrating every mental health service the agency offers into a single, veteran-focused resource.

Leo A Daly VA mental health hospital interior

The project’s design was inspired by direct input from veterans and clinicians. It takes into account the unique experiences of veterans and translates them into an environment tailored to their needs. The deign emphasizes spaces for gathering and sharing, enabling veterans to build and strengthen the common bond of service that is central to veteran identity. The dimensions, orientation, and interiors of every space are designed with trauma-informed principals in mind, reinforcing a sense of personal choice, safety, and space.

The design engages with nature via gardens and walking paths for veterans to enjoy. Indirect access to nature is provided through ample windows and clerestories, which provide natural light, views, and ease of wayfinding to reduce stress.

Leo A Daly VA mental health hospital lobby

Sustainability features include low-wattage LED lighting, automatic lighting controls, a high-performance building envelope, water use reduction, reduced emissions, recycled materials, automated controls, and ecological landscaping.

Construction for the $91 million U.S. Department of Veterans Affairs’ facility will being in early 2022. It is expected to take 18 months to complete. Cullinan Properties is the developer with Hoar Construction providing general contractor services. Prosser is the civil engineer.

Leo A Daly VA mental health hospital gathering space

Related Stories

Healthcare Facilities | May 7, 2018

Gulf Coast Medical Center to receive 365,700-sf extension and 48,500-sf renovation

HKS is designing the project and Skanska USA will build it.

Contractors | Apr 26, 2018

At Boston University’s dental school, ‘under construction’ won’t mean ‘closed for business’

A major renovation and addition are scheduled to minimize operational disruption.

Healthcare Facilities | Apr 24, 2018

The ins and outs of inmate healthcare

Research has shown that inmates are getting older and sicker.

Healthcare Facilities | Apr 20, 2018

Revamping pharmacies for public safety and compliance

Released in February 2016, the latest standards of the United States Pharmacopeia’s Chapter 800 Pharmaceutical Compounding—Sterile Preparations builds on earlier regulations set forth by USP 797.

Healthcare Facilities | Mar 28, 2018

Sound health: How tranquility rooms can heal caregivers

Sound can also be healing. It promotes a culture of quietness and enhances environments, not just for patients but also for caretakers.

Healthcare Facilities | Mar 5, 2018

Four tips for designing the hospital of the future

What exactly is the hospital of future? Or more specifically, what is the future of healthcare design?

Healthcare Facilities | Feb 28, 2018

Healthcare operations: The good and bad of the ‘visit per room per day’ metric

Merely pursuing a high “visit per room per day” metric may drive up other resource needs and, in turn, raise operational costs, writes HDR's Zhanting Gao.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021