flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Liberty Building Forensics cautions hotel building teams on moisture, mold issues

Liberty Building Forensics cautions hotel building teams on moisture, mold issues

Brand standards do not address local climatic conditions


August 27, 2014

Liberty Building Forensics Group, a building forensics firm warned building teams working on hotel projects to be on guard against moisture intrusion and mold.

Rigid adherence to brand standards in new hotel construction without factoring in specific regional and climatic conditions can result in significant mold and moisture issues, Liberty says. Global design standards typically do not take into consideration specific limitations of regional climates.

Regional violations in design standards have repeatedly resulted in extensive and costly mold and moisture problems in hotels, Liberty says. Hotel chains say their design standards are only guidelines, and that the designer or contractor on site is responsible for interpreting how to make adjustments for local climate. But brand standards are so specific and budget-driven that contractors typically adhere to them, even if they’re contrary to best climatic practices, Liberty says.

Liberty Vice President George DuBose says during the recent uptick in new hotel construction, his firm is seeing a recurrence of mold and moisture problems. “What we knew to work so well in the 1990s has been forgotten in today’s hotel design and construction,” Dubose says. “This poses a significant risk of new hotel failures that could mirror what we experienced in the 1980s and 1990s in warm, humid climates.”

(http://www.i-newswire.com/press-release/liberty-building-forensics-group-urges-caution-when-adhering-to)

Related Stories

| Nov 10, 2011

California seismic codes spur flurry of hospital projects

New seismic requirements in California are helping to drive a flurry of new projects and retrofits in the state’s health care sector.

| Nov 10, 2011

Senate ready to repeal 3% withholding on government contracts

The U.S. Senate is set to approve legislation that would eliminate a law requiring federal, state, and local governments to withhold 3% of their payments to contractors and companies doing business with the government.

| Nov 10, 2011

New legislation aimed at improving energy efficiency in federal buildings

Recently introduced legislation, the “High-Performance Federal Buildings Act,” would help federal agencies save energy and money by improving building performance.

| Nov 4, 2011

CSI and ICC Evaluation Service agree to reference GreenFormat in ICC-ES Environmental Reports?

ICC-ES currently references CSI's MasterFormat and other formats in all of its evaluation reports. The MOU will add GreenFormat references.

| Nov 3, 2011

House Votes to Kill 3% Withholding Requirement; Senate Yet to Vote

The U.S. House of Representatives voted last week to repeal a 3% IRS withholding tax on businesses that do work for the government.

| Nov 3, 2011

OSHA Publishes Information on Rights and Safety

OSHA recently published new and revised information that explains workers’ and employers’ rights, as well as how to protect workers from hazards in the construction industry.

| Nov 3, 2011

Sierra Club Critical of Albuquerque Mayor’s Push to Weaken Green Code

The mayor’s plan to move to a less environmentally friendly code would mean confusion for people in the construction industry and a loss of energy efficiency and money for consumers, said Shrayas Jatkar of the Sierra Club.

| Nov 3, 2011

Lax Code Enforcement Blamed for Deaths in Turkey’s Earthquake

Despite tough safety codes approved a decade ago after earthquakes killed 18,000 people, lax enforcement led to hundreds of deaths after a recent earthquake in Turkey.

| Nov 3, 2011

International Green Construction Code Will Provide Template for Local Codes

A uniform code for green construction is being readied for publication in March.

| Oct 31, 2011

NIST issues new code requirements

Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021