Augustana University officials have broken ground on a $50 million housing plan, which includes a construction of a new residence hall, on school's the Sioux Falls campus.
The L-shaped, three-story hall will house up to 200 students and include semi-suites with four beds and a bathroom in each unit. A community building at the front of the hall will include shared multi-purpose spaces and incorporate living and learning environments for faculty, students, and affinity groups on campus.
“We designed the new hall to be multi-functional for the entire campus community, and not just for the students living there,” said KWK Principal Paul Wuennenberg in a release. “Our design incorporates flexible classroom space that can be used for programming during the day, then utilized for community interactions in the evenings and weekends. A kitchen and lounge area in the hall further promotes community.”
The residence hall will be located on the south end of the university’s north campus near 33rd Street and Grange Avenue. KWK Architects is the lead designer for the new hall with TSP Inc. providing local architecture support, mechanical/electrical/structural engineering, and construction-phase services. Mortenson Construction is the developer/general contractor for the project, which is slated for completion in the fall of 2022.
Related Stories
| May 10, 2014
How your firm can gain an edge on university projects
Top administrators from five major universities describe how they are optimizing value on capital expenditures, financing, and design trends—and how their AEC partners can better serve them and other academic clients.
| May 1, 2014
First look: Cal State San Marcos's posh student union complex
The new 89,000-sf University Student Union at CSUSM features a massive, open-air amphitheater, student activity center with a game lounge, rooftop garden and patio, and ballroom space.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
Smart Buildings | Apr 28, 2014
Cities Alive: Arup report examines latest trends in urban green spaces
From vertical farming to glowing trees (yes, glowing trees), Arup engineers imagine the future of green infrastructure in cities across the world.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 8, 2014
Science, engineering find common ground on the Northeastern University campus [slideshow]
The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.