flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Local hiring requirement a tough challenge for new Detroit arena project

Local hiring requirement a tough challenge for new Detroit arena project

Shortage of tradespeople in the city causing headaches for developer


By BD+C Staff | July 16, 2014
Photo: Greenmars via Wikimedia Commons
Photo: Greenmars via Wikimedia Commons

An agreement for a land transfer from the City of Detroit to Ilitch Holdings Inc., that enabled construction of a new arena for the Detroit Red Wings requires that 51% of the project’s construction workers must come from the city. That stipulation is creating a challenge for Ilitch, the owner of the Red Wings, due to a shortage of skilled tradespeople who live in the city.

Construction firms that fall short of the hiring goal can still work on the project, but must pay a fee or offer free training and provide instructors and equipment. Many construction workers move out of the city after they acquire skills to earn a better wage. Detroit’s mayor is considering offering low-interest loans on city-owned houses to try to retain construction workers.

The arena construction will create an estimated 5,500 jobs with nearly 2,800 of those workers needing to come from Detroit. The project could become a training ground for tradespeople who will be needed on other major projects in the area including blight removal, the M-1 rail project, and the planned New International Trade Crossing bridge that will span the river between Detroit and Windsor, Ontario.

Even if the local hiring requirement weren’t in effect, the arena project would be hard pressed to find enough laborers, carpenters, electricians, pipe fitters and other trades, with the region experiencing a labor shortage due to an aging workforce.

(http://win-semich.org/challenges-loom-to-fill-2800-construction-jobs-in-detroit/)

Related Stories

Codes and Standards | Aug 11, 2020

Inefficient air conditioning is a key contributor to global warming

More efficient equipment and buildings could make a big difference.

Codes and Standards | Aug 10, 2020

Concrete Institute and Post-Tensioning Institutes expand partnership

Will collaborate on new structural post-tensioned concrete code requirements.

Codes and Standards | Aug 6, 2020

SpeedCore demonstrates excellent fire resistance without additional fire-protective coatings

New York City approves metal-concrete product for all five boroughs.

Codes and Standards | Aug 5, 2020

Designing, redeveloping communities for zero energy needed to address climate change

District heating and cooling systems boost efficiency.

Codes and Standards | Aug 4, 2020

Virginia is the first state to adopt COVID-19 worker safety rules

Include social distancing requirements, notifications when co-worker tests positive, timelines to return to work after recovery.

Codes and Standards | Aug 3, 2020

Report aids local governments on policy options, pathways to electrify new buildings

Document focuses on switching appliances and equipment away from natural gas, propane.

Codes and Standards | Jul 30, 2020

Institute for Market Transformation acquires Energy-Efficient Codes Coalition

Goal is to achieve net-zero construction by 2050.

Codes and Standards | Jul 29, 2020

Crackdowns grow on construction firms that fail to follow COVID-19 guidelines

States, cities, and OSHA enforce social distancing, hand-washing regulations.

Codes and Standards | Jul 28, 2020

California utility adopts climate emergency declaration

Sacramento-region company commits to working towards carbon neutrality by 2030.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021