Loews Hotels & Resorts is currently in the midst of a major growth and property redesign initiative, reflecting a strong national trend in hospitality renovation. The project touches 15 of the company's 19 properties, including 10 property renovations, three hotel acquisitions, and two new builds, ranging from updates to the building facades and the hotel lobbies, to new color palettes and renovated bathrooms.
With the redesign, Loews Hotels & Resorts puts an emphasis on repositioning the lobby and public spaces as areas for gathering and connectivity. Loews approached this goal by installing media walls with LCD flat screen TVs, increasing WiFi access and making electrical outlets more abundant and accessible. The design upgrades will also allow for more live entertainment and activity, which will encourage hotel guests and locals alike to utilize the public spaces for social interaction.
Beyond this common vision for more connectivity, each property takes a completely unique design approach. All the venues in the Loews portfolio have their own story, history and local character so there are no repeated design ideas from one property to the next.
Renovation highlights include top to bottom upgrades at the newly acquired Loews Hollywood Hotel, the extensive overhaul of Portofino Bay’s 750 rooms and suites, and the first ever, full renovation of the flagship location, Loews Regency Hotel, which is set to reopen early 2014. Below is a complete timeline and overview of the various renovations.
Renovation Timeline
Loews Annapolis Hotel – completed an extensive renovation of its lobby and restaurant in August of 2012.
Loews Coronado Bay Resort – completed a nine-month long transformation that included a complete redesign of its lobby, Bay Terrace, Cays Lounge, Market Café and Market-to-Go in January of 2013.
Loews Philadelphia Hotel – completed a three-month long guestroom renovation in April of 2013. The hotel will undergo a total transformation of its lobby, entrance and restaurant/bar area in the coming year.
Loews Portofino Bay Hotel – completed an immense renovation project that refreshed all 750 rooms and suites with a new Mediterranean-inspired design that enhances the overall guest experience in April of 2013.
Loews Santa Monica Beach Hotel – completed a façade renovation in April of 2013 and will finish renovation of a series of rooms adjacent to the pool to create premium poolside cabana rooms, as well as a series of beach-level rooms that will feature residential-style patios, complete with fire pits later this year.
Loews Vanderbilt Hotel – completed an extensive renovation including a complete redesign of the lobby, remodeled corridors, new guest and public bathrooms, and the new Mason’s restaurant and Mason Bar in May of 2013.
Loews Hôtel Vogue – completed a property renovation including redesigned guest rooms, an updated lobby, exterior façade and the addition of the renowned La Société Bistro from Toronto, in June of 2013.
Loews Hollywood Hotel – acquired the historic Hollywood Hotel, home to the former Kodak Theater, now the Dolby Theater, a major partner of the annual Academy Awards ceremony completed in the summer of 2012. Hotel is currently undergoing a renovation of all guestrooms, the lobby, lobby bar, restaurant and meeting spaces, scheduled for completion in November of 2013.
Loews Regency Hotel – undergoing its first-ever full renovation in its 50-year history. The redesign will maintain the traditional elements that helped shape the hotel as a New York Institution, but will be complemented by new modern touches that will still uphold the overall Loews Regency legacy. The hotel is set to re-open in January of 2014.
Loews Boston Back Bay Hotel – acquired the 225-room Back Bay Hotel in Boston in February of 2013 and renovations are scheduled to begin in the fall of this year finished in April of 2014
Related Stories
| Nov 2, 2010
Energy Analysis No Longer a Luxury
Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.
| Nov 2, 2010
Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’
Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.
| Nov 2, 2010
Historic changes to commercial building energy codes drive energy efficiency, emissions reductions
Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC) represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.
| Nov 1, 2010
Sustainable, mixed-income housing to revitalize community
The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.