Late next month, the Toyota Music Factory, a large entertainment hub in Irving, Texas, with 20 restaurant and entertainment concepts, will have a soft opening for Rayleigh Underground, a 38,000-sf theater with a capacity of 850 and complemented by an overhead 6,000-person concert venue operated by Live Nation.
Named after Lord Rayleigh, a Nobel Prize-winning scientist who first identified acoustics and lightwave scattering, Rayleigh Underground features an 18x50-ft stage with a 36x18-ft Absen 2.9 pitch video wall on the center stage. The venue will also have multiple interactive LED screens throughout, six bars, of which two are VIP; a large ballroom/conferencen space that can accommodate three separate dining areas; and an AV Booth to MC any type of event or performance.
According to Chris Michero, co-founder and design principal with Dallas-based Emblem Interior Design, this project’s interior designer, Rayleigh Underground was created to provide a more intimate space for performers, artists, comedians, and guest speakers, along with a “submissive” Pacific Rim-flavored dining experience for guests.
Venue’s design tells stories
This project has been in the works for several years. The Toyota Music Factory opened in late 2017. A year later, following a resolution of a financial dispute between the city and developer, the Dallas News reported that the hub would add five restaurants and bars, including one called Rayleigh Underground and Violet Room that included a large stage.
Michero explains that Rayleigh Underground’s completion was impeded by several factors.
The project’s original designer “created a lot of issues [with] regard to mechanical, HVAC, space planning, etc.,” he says in an email to BD+C. “There was no real design narrative.” When Emblem was hired to replace that designer, it did a full redesign that touched every finish and material. Emblem created “storied spaces that give the guests a sense of place and a history to the interiors, which makes each experience more memorable.” Michero adds that the size of Rayleigh Underground and the multiple areas within it “tie back to our design narrative.”
Like entering a cave
One of those “narratives” fuses innovative technology with the raw aesthetic of an excavated underground amphitheater. StoneCoat’s limestone plaster cladding creates interior and exterior surfaces that project the look and feel of authentic rock, stone, and stucco.
“We wanted to create a unique and memorable guest experience,” said Kim Forsythe, owner of Restaurant Expert Management, Rayleigh Underground’s client, in a prepared statement.
Other members of Rayleigh Underground’s building team include PGP Construction (GC), Herb Goodman (CM and owner’s rep), Mark Hopper (architect), Brookfield Properties Development (the Toyota Music Factory landlord), GME (electrical), EPS (plumbing), Kosel (HVAC and controls), Hatfield (acoustical drywall assemblies), Carpentry Associates (millwork and metalwork for the bars), AllPro (A/V), Highland (fire suppression), Mitec (fire and property protection), Stonehill Industries (painting), Sigma Signs (signage), and CMC Network Solutions (data and low voltage).
Rayleigh Underground is scheduled to open officially in December.
Related Stories
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.
| Jan 21, 2011
Music festival’s new home showcases scenic setting
Epstein Joslin Architects, Cambridge, Mass., designed the Shalin Liu Performance Center in Rockport, Mass., to showcase the Rockport Chamber Music Festival, as well at the site’s ocean views.
| Jan 4, 2011
An official bargain, White House loses $79 million in property value
One of the most famous office buildings in the world—and the official the residence of the President of the United States—is now worth only $251.6 million. At the top of the housing boom, the 132-room complex was valued at $331.5 million (still sounds like a bargain), according to Zillow, the online real estate marketplace. That reflects a decline in property value of about 24%.
| Dec 17, 2010
Sam Houston State arts programs expand into new performance center
Theater, music, and dance programs at Sam Houston State University have a new venue in the 101,945-sf, $38.5 million James and Nancy Gaertner Performing Arts Center. WHR Architects, Houston, designed the new center to connect two existing buildings at the Huntsville, Texas, campus.
| Nov 3, 2010
Park’s green education center a lesson in sustainability
The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.
| Oct 13, 2010
Biloxi’s convention center bigger, better after Katrina
The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.
| Oct 13, 2010
Community center under way in NYC seeks LEED Platinum
A curving, 550-foot-long glass arcade dubbed the “Wall of Light” is the standout architectural and sustainable feature of the Battery Park City Community Center, a 60,000-sf complex located in a two-tower residential Lower Manhattan complex. Hanrahan Meyers Architects designed the glass arcade to act as a passive energy system, bringing natural light into all interior spaces.
| Oct 13, 2010
Bookworms in Silver Spring getting new library
The residents of Silver Spring, Md., will soon have a new 112,000-sf library. The project is aiming for LEED Silver certification.
| Oct 12, 2010
Holton Career and Resource Center, Durham, N.C.
27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.