flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Luxembourg office complex breaks ground in Belval

Office Buildings

Luxembourg office complex breaks ground in Belval

Foster + Partners designed the building.


By David Malone, Associate Editor | June 1, 2020
ICONE interior space

All images courtesy Foster + Partners

A new Foster + Partners-designed office building in Belval, Luxembourg has broken ground. 

Dubbed ICÔNE, the 202,000-sf office complex has an interior reminiscent of an Escher painting, filled with light and greenery. The flexible layout encourages collaboration and addresses the need for safe working environments and the changes to the workplace that will emerge in the future.

“The project is designed to have open, flexible workspaces that respond to the emerging models of work today,” said Darron Haycock, Partner, Foster + Partners, in a release. “The atrium is a green light-filled space that is very much the social heart of the project, providing visual connectivity and a dynamic atmosphere for both work and play. Biophilia, the green landscaping, natural ventilation and visual connectivity all promoting collaboration and healthy wellbeing.”

 

Icone exterior in Luxembourg

 

The building was also designed to reference the industrial heritage of Belval and revitalize the area by making a positive contribution to the site and its surroundings. It is wrapped by an orthogonal facade and roof that emphasize the structural grid and give the building a unified industrial look. The façade is both structural and environmentally responsive, providing an integrated solution which allows for internal column-free office spaces as well as solar shading and maximized internal daylight.

The scheme releases to its neighboring buildings and addresses the different characteristics of the principal axes to the east and west. Entrances are articulated differently in response to the urban street and civic plaza while the building edge along Porte de France contains shops. Cafes and restaurants on the ground floor complement Place de l'Académie.

 

ICONE interior space

 

ICÔNE is arranged as two wings enclosing the central atrium. The atrium resolves the level changes between the street and the plaza though a series of stepped terraces that create an arrival sequence. The open circulation features communal terraces for informal meetings and break out spaces at higher levels overlooking the central volume. Glimpses of interior green spaces can be see-through a series of punched volumes that intersect the gridded structure.

The design, created in collaboration with Beiler Francois Fritsch, aims for a BREEAM Excellent rating and will be WELL Building Standard® certified.

 

ICONE collaboration break out space

 

ICONE terrace space

Related Stories

Office Buildings | Nov 15, 2016

Under Armour unveils phase one of 50-acre Baltimore headquarters

The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.

Office Buildings | Nov 14, 2016

Media’s adaptive shift: Converged environments

The converged environment is a live-streaming workplace, a zone where news and content flow continuously and speed to market is everything.

High-rise Construction | Nov 3, 2016

Two identical Kohn Pederson Fox office towers may be headed to Wacker Drive

Murphy Development Group is looking for tenants for the $800 million project.

Office Buildings | Oct 26, 2016

The power of office amenities in the workplace

With a continued focus on providing more with less, companies across all industries are continually driving their workers to increase efficiency and productivity—to get product and services to market faster and cheaper, writes LPA's Karen Thomas.

High-rise Construction | Oct 5, 2016

Plans for Hudson Yards skyscraper from Bjarke Ingels have officially been filed

The 65-story tower will be primarily office space and has an estimated development cost of $3.2 billion

Office Buildings | Sep 30, 2016

How to choose the right amenities for your office

No matter how lavish the amenities, they’ll prove ineffective in making any kind of positive impact if they don’t align to a company’s culture and the characteristics that make an organization unique, write Gensler’s Lena Kitson and Kimberly Foster.

High-rise Construction | Sep 23, 2016

A massive redevelopment in Tokyo reunites developer and architect

Mitsui Fudosan and SOM join forces to create OH-1, a mixed-use complex with a prominent public square.

Office Buildings | Sep 22, 2016

‘Floating’ triangular glass building from Foster + Partners breaks ground in Copenhagen

The glass building provides the illusion of floating above a stone plinth.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021