flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity at U.S. AEC firms up slightly

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.


By Posted by BD+C Staff | January 2, 2013

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011, according to consulting firm Morrissey Goodale, Newton, Mass. (www.morrisseygoodale.com).

One recent acquisition: Gantt Huberman Architects, a 26-person architecture/interiors firm in Charlotte, N.C., by Bergmann Associates, an architecture-engineering-planning firm headquartered in Rochester, N.Y. This makes the twelfth office for Bergmann and gives it a toehold in the Carolinas, according to Morrissey Goodale. Bergman now has 375 employees.

Meanwhile, supergiant Canadian A/E design firm Stantec, Edmonton, Alb. (2011 revenues: $463,300,000) was set to close on the acquisition of Greenhorne & O’Mara, a 520-employee engineering firm in Laurel, Md. Stantec also said it would pick up 21-person Architecture 2000, Moncton, N.B.

Other recent M&A activity of note:

  • Moseley Architects (Richmond, Va.), known as a specialist in public-sector work, merged with BeeryRio (Springfield, Va.), a specialist in the design of senior housing.
  • Haskell, an integrated designer, engineering, and construction firm based in Jacksonville, Fla., purchased H.R. Gray (Columbus, Ohio), a program management and construction services firm specializing in municipal projects.
  • Canadian giant IBI Group (Toronto) finalized the deal for M-E Companies (Columbus, Ohio), an 80-member CE firm. +

Related Stories

| Aug 21, 2012

Under 40 Leadership Summit slated for October 3-5 in Chicago

Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021