flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity at U.S. AEC firms up slightly

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.


By Posted by BD+C Staff | January 2, 2013

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011, according to consulting firm Morrissey Goodale, Newton, Mass. (www.morrisseygoodale.com).

One recent acquisition: Gantt Huberman Architects, a 26-person architecture/interiors firm in Charlotte, N.C., by Bergmann Associates, an architecture-engineering-planning firm headquartered in Rochester, N.Y. This makes the twelfth office for Bergmann and gives it a toehold in the Carolinas, according to Morrissey Goodale. Bergman now has 375 employees.

Meanwhile, supergiant Canadian A/E design firm Stantec, Edmonton, Alb. (2011 revenues: $463,300,000) was set to close on the acquisition of Greenhorne & O’Mara, a 520-employee engineering firm in Laurel, Md. Stantec also said it would pick up 21-person Architecture 2000, Moncton, N.B.

Other recent M&A activity of note:

  • Moseley Architects (Richmond, Va.), known as a specialist in public-sector work, merged with BeeryRio (Springfield, Va.), a specialist in the design of senior housing.
  • Haskell, an integrated designer, engineering, and construction firm based in Jacksonville, Fla., purchased H.R. Gray (Columbus, Ohio), a program management and construction services firm specializing in municipal projects.
  • Canadian giant IBI Group (Toronto) finalized the deal for M-E Companies (Columbus, Ohio), an 80-member CE firm. +

Related Stories

| Jan 16, 2012

Suffolk completes construction on progressive operating suite

5,700 square-foot operating suite to be test bed for next generation of imaged-guided operating techniques.

| Jan 15, 2012

Hollister Construction Services oversees interior office fit-out for Harding Loevner

The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes. 

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Jan 15, 2012

535 Madison Avenue achieves LEED Gold certification

Class-A commercial building meets sustainability requirements of LEED Program.

| Jan 12, 2012

CSHQA receives AIA Northwest & Pacific Region Merit Award for Idaho State Capitol restoration

After a century of service, use, and countless modifications which eroded the historical character of the building and grounds, the restoration brought the 200,000-sf building back to its former grandeur by restoring historical elements, preserving existing materials, and rehabilitating spaces for contemporary uses.

| Jan 12, 2012

Stellar earns construction industry's most prestigious safety award

Now widely accepted as the construction industry's standard measure of safety performance, the STEP awards were established in 1989 to evaluate and improve safety practices and recognize outstanding safety efforts. 

| Jan 12, 2012

Building independence: New take on female power

Memoir explores historic engineering project, women's empowerment era.

| Jan 12, 2012

3M takes part in Better Buildings Challenge

As a partner in the challenge, 3M has committed to reduce energy use by 25% in 78 of its plants, encompassing nearly 38 million-sf of building space.

| Jan 11, 2012

DOE announces guide for 50% more energy efficient retail buildings

The 50% AEDG series provides a practical approach for designers and builders of retail stores, and other major commercial building types, to achieve 50% energy savings compared to the building energy code used in many parts of the nation. 

| Jan 11, 2012

Mortenson starts construction of Rim Rock Wind Project

Renewable energy contractor to build 189-megawatt wind project in Sunburst, Mont.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021