flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

M&A activity at U.S. AEC firms up slightly

M&A activity at U.S. AEC firms up slightly

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011.


By Posted by BD+C Staff | January 2, 2013

Total mergers and acquisitions in the AEC industry hit 171 in 2012, up slight from the 169 deals in 2011, according to consulting firm Morrissey Goodale, Newton, Mass. (www.morrisseygoodale.com).

One recent acquisition: Gantt Huberman Architects, a 26-person architecture/interiors firm in Charlotte, N.C., by Bergmann Associates, an architecture-engineering-planning firm headquartered in Rochester, N.Y. This makes the twelfth office for Bergmann and gives it a toehold in the Carolinas, according to Morrissey Goodale. Bergman now has 375 employees.

Meanwhile, supergiant Canadian A/E design firm Stantec, Edmonton, Alb. (2011 revenues: $463,300,000) was set to close on the acquisition of Greenhorne & O’Mara, a 520-employee engineering firm in Laurel, Md. Stantec also said it would pick up 21-person Architecture 2000, Moncton, N.B.

Other recent M&A activity of note:

  • Moseley Architects (Richmond, Va.), known as a specialist in public-sector work, merged with BeeryRio (Springfield, Va.), a specialist in the design of senior housing.
  • Haskell, an integrated designer, engineering, and construction firm based in Jacksonville, Fla., purchased H.R. Gray (Columbus, Ohio), a program management and construction services firm specializing in municipal projects.
  • Canadian giant IBI Group (Toronto) finalized the deal for M-E Companies (Columbus, Ohio), an 80-member CE firm. +

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

| May 25, 2011

Hotel offers water beds on a grand scale

A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

| May 25, 2011

World’s tallest building now available in smaller size

Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021