flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

MAD Architects unveils design for Hainan Science and Technology Museum

Museums

MAD Architects unveils design for Hainan Science and Technology Museum

The project is slated to break ground in late August.


By David Malone, Managing Editor | August 24, 2021
Hainan Museum of Science and Technology exterior from the water

Renderings courtesy MAD Architects

MAD Architects has revealed the design for the Hainan Science and Technology Museum, located on Haikou’s west coast in Hainan province, shortly before the project is set to break ground at the end of August.

The 500,000-sf museum draws from the site’s dual urban and natural context, set against the backdrop of a tropical rainforest. The museum’s main pavilion is shaped like a cloud in dialogue with nature. From a distance, the building is designed to emerge from the city, while it will appear to visitors entering the museum area to be floating above the jungle.

 

Hainan Museum of Science and Technology exterior

 

About 299,000 sf of the museum’s total area is located above ground and includes permanent exhibition space, a planetarium, a giant-screen theater, and a flying theater. The museum’s interior structure comprises three floor-to-ceiling cores, curved trusses, spiral ramps, and a roof, that are all exposed to achieve harmony between the architectural forms and structural system. A skylight in the museum’s dome bathes the atrium in natural light while a sloping, spiraling exhibition space ascends from the central hall over five floors to connect visitors across the museum.

 

Hainan Museum of Science and Technology planetarium

 

The exhibition experience begins on the fifth floor where the elevator opens to a 360-degree viewing platform with the sea and cityscape visible in the distance. Visitors on the top floor begin by exploring the technology and space galleries before proceeding down the ramp to the ocean and life science galleries on the fourth floor. The math and science galleries are on the third floor and the multimedia interactive experience area and the children’s playground are on the second floor. As visitors travel down the ramp, the can simultaneously enjoy the scenery and the exhibitions and a gallery running alongside the ramp extends the viewing experience.

 

Hainan Museum of Science and Technology main hall

 

The museum’s facade of fiber-reinforced plastic gives the building a distinctive silver, reflective exterior from both near and far. An undulating canopy extends from the main pavilion in all directions to create a space specifically conceived to accommodate the public in Haikou’s humid and rainy climate. The north side of the canopy also hosts the giant screen and flying theater. The southwest corner hosts the planetarium and observatory.  Outdoor public spaces include a crater-like sunken plaza and a reflecting pool.

The Hainan Science and Technology Museum is slated for completion in 2024.

 

Hainan Museum of Science and Technology exterior

 

Hainan Museum of Science and Technology exterior at dusk

Tags

Related Stories

University Buildings | Feb 18, 2022

On-campus performing arts centers and museums can be talent magnets for universities

Cultural facilities are changing the way prospective students and parents view higher education campuses.

Museums | Jan 25, 2022

Cooper Robertson selected to design master plan for Munson-Williams-Proctor Arts Institute

The project will seek public input regarding the campus master plan.

Museums | Jan 14, 2022

The Shedd Aquarium unveils its $500 million vision for the future

The project will prepare the aquarium for the next 100 years.

Museums | Dec 20, 2021

Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance

The museum is one of NYC’s only major museums with free admission.

Museums | Dec 7, 2021

The Palo Alto Junior Museum and Zoo completes

CAW Architects designed the project.

Giants 400 | Nov 19, 2021

2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Museums | Nov 10, 2021

Tampa Museum of Art announces $65 million expansion

Weiss/Manfredi is designing the expansion and the renovation of the existing museum building.

Museums | Oct 29, 2021

Rowan University’s new fossil museum sits within an active dinosaur fossil dig

   Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.

Museums | Oct 15, 2021

Kunsthaus Zürich extension opens to the public

David Chipperfield Architects Berlin designed the project.

Museums | Sep 27, 2021

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Renzo Piano Building Workshop designed the project.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021