flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Major architecture firms are flocking to Dubai’s Design District

Building Team

Major architecture firms are flocking to Dubai’s Design District

Three more major firms are making a permanent home in Dubai.


By David Malone, Associate Editor | November 15, 2016

Rendering courtesy of Santiago Calatrava

Dubai’s Design District, which has already seen the likes of Zaha Hadid Architects open an office in early November, is about to welcome Foster + Partners and Santiago Calatrava as residents, soon, as well.

These most recent firms will join 30 other architecture practices that are already based in the United Arab Emirates city, according to Dezeen. Not only has Dubai been at the center of the rise of the Middle Eastern architecture market, thus making itself an attractive locale for an office, but also each of these three firms is already hard at work on major Middle Eastern projects.

ZHA unveiled its plans for the Urban Heritage Administration Centre in Saudi Arabia and a hotel in a new city in Qatar. Santiago Calatrava is hard at work on an observation tower in Dubai that is expected to rise higher than the Burj Khalifa. Meanwhile, Foster + Partners is working on a skyscraper for Dubai’s financial district and a creative hub that will be a part of the design district.

Related Stories

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 9, 2011

BEST AEC FIRMS 2011: EYP Architecture & Engineering

Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 2, 2011

Alexandria Real Estate Equities, Inc. breaks ground on Alexandria Center in Cambridge, Mass.

307,000-sf building to be house to executive offices of Biogen Idec.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

| Oct 24, 2011

FMI releases Adjust, Adapt, Act Study

 The paper explores several case studies, including Sun Country Builders, Huen, BakerTriangle, Consigli, Skender Construction and Flatiron, and distills the key factors that make these companies unique and successful.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021