flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manassas Museum renovated to reimagine a civic design & engage the community

Manassas Museum renovated to reimagine a civic design & engage the community

The museum initially opened as a temporary exhibit in 1974 and was later relocated to downtown Manassas in 1991.


By Malcolm Crumbley, Associate Editor | August 19, 2022
Manassas Museum ext 1 lead image
Courtesy GWWO Architects.

Manassas, VA has recently broken ground on an addition to its Manassas Museum. The museum initially opened as a temporary exhibit in 1974 and was later relocated to downtown Manassas in 1991. The addition is set to open in 2023 on the 150th anniversary of the Manassas community.

The Manassas Museum had already had a huge amount of significance in the Historic Downtown, providing space for education, conversation, and a regional connection in the community. As for the addition, the city partnered with GWWO Architects in order to reimagine a renewed civic design.

The renovation will transform the physical relationship between the museum and its lawn by removing an existing isolating courtyard wall. The addition will be situated to engage the community, fully activate the museum green space, and improve visitor flow. The expansion will elevate the museum’s presence, responding to its role as a significant piece of civic architecture while respecting the scale of the historic core and view of the building’s iconic cupola. Visible from the nearby train station, the expansion will attract new visitors to educate them on the story of Manassas.

The addition will flank the building’s existing wings and welcome those arriving downtown. Clad in pre-patinated copper, the form of the special exhibit hall opens to the park creating dynamic views that engage visitors and the community. Transparent glazing along the courtyard will create a continual dialogue between the museum and outdoor spaces. 

Renovations to the existing building include a new exhibit space with views into an expanded collections storage area. 

The 4,800-sf addition also includes:

  • A new exhibit hall
  • Offices
  • Support space
  • An administrative wing located opposite of the new exhibit hall
  • A re-envisioned courtyard and amphitheater
  • A new entry and corridors with exhibits

Museum sustainable best practices:

  • Bird-friendly glazing
  • Low-albedo roofing
  • LED lighting
  • Daylighting in all occupied spaces
  • Upgrades to high-efficiency mechanical with energy recovery

On the Building Team:
Owner/Developer: City of Manassas
Landscape Architect: RHI
MEP Engineer: Mueller Associates
Structural Engineer: Thornton Tomasetti
Civil Engineer: Ross-France
Cost Estimator: Forella Group
Geotechnical Engineer: Schnabel

Manassas Museum ext 2
Courtesy GWWO Architects.
Manassas Museum ext 3
Courtesy GWWO Architects.

 

Related Stories

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

High-rise Construction | Mar 16, 2015

Mexican Museum tower caught in turmoil to break ground this summer in San Francisco

Millennium Partners said it will break ground on the 53-story residential and museum tower while the lawsuits go through the appeals process.

Museums | Mar 9, 2015

Architecture based on astronomy principles for new planetarium in Shanghai

The ancient Chinese civilization left some of the earliest records of humans studying the stars and skies. To exhibit this long history, a new planetarium and astronomy museum is planned for construction in Shanghai.

Museums | Mar 5, 2015

A giant, silver loop in Dubai will house the Museum of the Future

The Sheikh of Dubai hopes the $136 million museum will serve as an incubator for ideas and real designs—a global destination for inventors and entrepreneurs.

Architects | Feb 27, 2015

5 finalists announced for 2015 Mies van der Rohe Award

Bjarke Ingels' Danish Maritime Museum and the Ravensburg Art Museum by Lederer Ragnarsdóttir Oei are among the five projects vying for the award.

Museums | Feb 18, 2015

Foster + Partners' National Museum of Marine Science and Technology breaks ground in Taiwan

The museum will be home to an aquarium, exhibition space, and waterfront views. 

Museums | Feb 17, 2015

Light will shimmer through roof cutouts in Jean Nouvel’s Louvre Abu Dhabi

After many delays since construction started in 2009, the Jean Nouvel-designed Louvre Abu Dhabi is slated for completion sometime this year.

Architects | Feb 11, 2015

Shortlist for 2015 Mies van der Rohe Award announced

Copenhagen, Berlin, and Rotterdam are the cities where most of the shortlisted works have been built. 

Museums | Feb 9, 2015

Herzog & de Meuron's M+ museum begins construction in Hong Kong

When completed, M+ will be one of the first buildings in the Foster + Partners-planned West Kowloon Cultural District.

Museums | Feb 6, 2015

Tacoma Art Museum's new wing features sun screens that operate like railroad box car doors

The 16-foot-tall screens, operated by a hand wheel, roll like box car doors across the façade and interlace with a set of fixed screens.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021