flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Manchester modular hotel is constructed of shipping containers

Hotel Facilities

Manchester modular hotel is constructed of shipping containers

The 220-room Holiday Inn Express hopes to be completed in less than 12 months.


By David Malone, Associate Editor | May 18, 2017

Rendering courtesy of Chapman Taylor

Purpose built shipping containers are being used in the construction of a modular 220-room Holiday Inn Express in Trafford City, Manchester, UK.

The shipping containers come with fully factory finished interior fixtures and fittings that are installed before being delivered to the site. Additionally, the rooms have full height windows and are fully furnished before leaving the factory.

In order to make the off-site modular design the hotel uses work, Chapman Taylor, the architect for the project, developed a fully coordinated BIM model to inform the detailed design and enable the off-site works to commence. Chapman Taylor and Bowmer & Kirkland, the contractor, hope to deliver the project in less than 12 months.

 

Rendering courtesy of Chapman Taylor.

 

Construction of the ground floor and podium structure is underway on site while, simultaneously, the bedroom modules are being manufactured off-site. Once delivered, the modules will be stacked on top of the podium structure. Each of the 220 guest room modules will be installed within a two to four week period.

One module comprises two fully furnished en-suite rooms that are separated by a section of circulation corridor. Once the modules are in place on site, the external envelope, which consists of prefinished rainscreen cladding and single ply roofing systems, is applied.

The project is a joint venture between Mill Lane Estates, Topland Group, and Marick.

Related Stories

Hotel Facilities | Aug 11, 2021

Jasper Architects wins design competition for hotel in Kuwait

The project is inspired by Kuwait’s desert landscape.

Market Data | Jul 28, 2021

Marriott has the largest construction pipeline of U.S. franchise companies in Q2‘21

472 new hotels with 59,034 rooms opened across the United States during the first half of 2021.

Market Data | Jul 26, 2021

U.S. construction pipeline continues along the road to recovery

During the first and second quarters of 2021, the U.S. opened 472 new hotels with 59,034 rooms.

Contractors | Jul 23, 2021

The aggressive growth of Salas O'Brien, with CEO Darin Anderson

Engineering firm Salas O'Brien has made multiple acquisitions over the past two years to achieve its Be Local Everywhere business model. In this exclusive interview for HorizonTV, BD+C's John Caulfield sits down with the firm's Chairman and CEO, Darin Anderson, to discuss its business model.

Hotel Facilities | Jul 20, 2021

A new Times Square hotel positions itself as a resort

Margaritaville Resort arrives as New York City considers creating entertainment districts.

Multifamily Housing | Jul 11, 2021

Aluminum railing systems offer ‘versatile styling, easy installation’

Trex Aluminum railing systems offer ‘versatile styling, easy installation,' says the manufacturer.

Daylighting Designs | Jul 9, 2021

New daylighting diffusers come in three shape options

Solatube introduces its newest technology innovation to its commercial product line, the OptiView Shaping Diffusers.

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Hotel Facilities | Jun 18, 2021

Adaptive reuse for hospitality, with Frank Cretella of Landmark Developers

In an exclusive interview for HorizonTV, Landmark Developers' President Frank Cretella talks about the firm's adaptive reuse projects for the hospitality sector. Cretella outlines his company's keys to success in hospitality development, including finding unique properties and creating memorable spaces.

Hotel Facilities | May 26, 2021

Loisium Wine and Spa Resort expansion opens in Langenlois, Austria

Steven Holl Architects designed both the expansion and the original resort with associate architects Sam-Ott-Reinisch.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021