Purpose built shipping containers are being used in the construction of a modular 220-room Holiday Inn Express in Trafford City, Manchester, UK.
The shipping containers come with fully factory finished interior fixtures and fittings that are installed before being delivered to the site. Additionally, the rooms have full height windows and are fully furnished before leaving the factory.
In order to make the off-site modular design the hotel uses work, Chapman Taylor, the architect for the project, developed a fully coordinated BIM model to inform the detailed design and enable the off-site works to commence. Chapman Taylor and Bowmer & Kirkland, the contractor, hope to deliver the project in less than 12 months.
Rendering courtesy of Chapman Taylor.
Construction of the ground floor and podium structure is underway on site while, simultaneously, the bedroom modules are being manufactured off-site. Once delivered, the modules will be stacked on top of the podium structure. Each of the 220 guest room modules will be installed within a two to four week period.
One module comprises two fully furnished en-suite rooms that are separated by a section of circulation corridor. Once the modules are in place on site, the external envelope, which consists of prefinished rainscreen cladding and single ply roofing systems, is applied.
The project is a joint venture between Mill Lane Estates, Topland Group, and Marick.
Related Stories
| Jul 22, 2013
Top Hotel Architecture Firms [2013 Giants 300 Report]
Gensler, WATG, HKS top Building Design+Construction's 2013 ranking of the largest hotel architecture and architecture/engineering firms in the U.S.
| Jul 22, 2013
Hotel business continues to shine [2013 Giants 300 Report]
Despite some economic stressors, hotel operating fundamentals are poised to remain strong in 2013.
| Jul 22, 2013
Convention Center Report [2013 Giants 300 Report]
Building Design+Construction's rankings of design and construction firms with the most revenue from convention center projects, as reported in the 2013 Giants 300 Report.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.
| Jul 17, 2013
CBRE recognizes nation's best green research projects
A rating system for comparative tenant energy use and a detailed evaluation of Energy Star energy management strategies are among the green research projects to be honored by commercial real estate giant CBRE Group.
| Jul 10, 2013
World's best new skyscrapers [slideshow]
The Bow in Calgary and CCTV Headquarters in Beijing are among the world's best new high-rise projects, according to the Council on Tall Buildings and Urban Habitat.
| Jul 10, 2013
TED talk: Architect Michael Green on why we should build tomorrow's skyscrapers out of wood
In a newly posted TED talk, wood skyscraper expert Michael Green makes the case for building the next-generation of mid- and high-rise buildings out of wood.
High-rise Construction | Jul 9, 2013
5 innovations in high-rise building design
KONE's carbon-fiber hoisting technology and the Broad Group's prefab construction process are among the breakthroughs named 2013 Innovation Award winners by the Council on Tall Buildings and Urban Habitat.
| Jul 8, 2013
RSMeans cost comparisons: hotels, motels, and apartment buildings
Construction market analysts from RSMeans offer construction costs per square foot for hotels, motels, and apartment buildings.