flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marriott has the largest construction pipeline of any franchise company in the U.S.

Hotel Facilities

Marriott has the largest construction pipeline of any franchise company in the U.S.

Marriott has the most rooms currently under construction with 482 Projects/67,434 Rooms.


By Lodging Econometrics | September 6, 2017
Rooms lining a hotel hallway

Pixabay Public Domain

Marriott International currently has the largest construction pipeline of any franchise company with 1,288 Projects/166,096 Rooms. Their largest brands in the Pipeline are: Fairfield Inn with 283 Projects/27,244 Rooms, Residence Inn with 187 Projects/23,617 Rooms and TownePlace Suites with 184 Projects/18,757 Rooms.

Marriott has the most rooms currently Under Construction with 482 Projects/67,434 Rooms, which represents almost 1/3 of all Pipeline rooms Under Construction. Additionally, they have the most rooms Scheduled to Start Construction in the Next 12 Months with 619 Projects/76,451 Rooms. Marriott also has 187 Projects/22,211 Rooms in Early Planning,

In the first half of the year, Marriott opened 120 new hotels with 14,071 rooms, accounting for 27% of all new hotels opened this year. The Marriott brands with the largest number of new hotels opened this year are Fairfield Inn with 31 Hotels/2,887 Rooms and Courtyard with 18 Hotels/2,104 Rooms.

Related Stories

Hotel Facilities | Jul 17, 2017

This space hotel design from MIT won NASA’s graduate design competition

The project team consisted of MIT graduate students across five departments.

Mixed-Use | Jul 7, 2017

ZHA’s Mandarin Oriental hotel and residences employs ‘stacked vases’ design approach

The mixed-use tower will rise 185 meters and be located in Melbourne's Central Business District.

Hotel Facilities | Jul 5, 2017

It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension

PPVC techniques allowed the project to save time and manpower.

Hotel Facilities | Jun 29, 2017

Luxury, plant-covered hotel unveiled for site near the River Seine

Kengo Kuma is designing the hotel, which will feature a large garden and a plant-covered façade. 

Hotel Facilities | Jun 28, 2017

This floating hotel in Sweden freezes in place during the winter

The hotel will feature a cold bath and be in a good location for viewing the northern lights.

Hotel Facilities | Jun 14, 2017

Finalists selected for Radical Innovation award

Original hospitality design concepts lean on enhancing traveler comfort and mobility.  

Hotel Facilities | May 19, 2017

Beyond market niches: Designing hotels that can flex

There’s a shift from accommodating to specific market niches towards places that can adapt to changing moods and activities.

Hotel Facilities | May 18, 2017

Manchester modular hotel is constructed of shipping containers

The 220-room Holiday Inn Express hopes to be completed in less than 12 months.

Events Facilities | Apr 27, 2017

20-acre lagoon highlights $1.5 billion Paradise Park planned for Las Vegas

The Wynn Resorts board recently gave the go-ahead for the project, which may begin construction on its first phase as early as December.

Hotel Facilities | Apr 12, 2017

Hotels embrace place

Today’s hospitality environments emphasize unique, localized experiences to attract and engage guests.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021