flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

Hotel Facilities

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S.


By Lodging Econometrics | October 28, 2021
Hotel room

Courtesy Pixabay

According to the third quarter report by analysts at Lodging Econometrics (LE), the franchise companies leading the U.S. construction pipeline with the greatest number of new construction projects are Marriott International with 1,286 projects/166,174 rooms, Hilton Worldwide with 1,223 projects/139,742 rooms, and InterContinental Hotels Group (IHG) with 769 projects/77,558 rooms. The construction pipelines for these three franchise companies comprise an impressive 68% of the total construction pipeline projects.

The leading brands by project count in the construction pipeline for each of these three companies are Hilton’s Home2 Suites by Hilton with 402 projects/41,846 rooms, IHG’s Holiday Inn Express with 301 projects/28,852 rooms, and Marriott’s Fairfield Inn with 246 projects/23,653 rooms. These three mid-market brands alone account for 20% of the projects in the total construction pipeline.

Other significant brands in the pipeline for these franchises include Hilton’s Hampton by Hilton, reaching a cyclical peak, with 271 projects/28,311 rooms and Tru by Hilton with 224 projects/21,518 rooms; Marriott’s TownePlace Suites with 204 projects/19,5693 rooms and Residence Inn with 203 projects/25,132 rooms; IHG’s Avid Hotel with 152 projects/13,255 rooms and Staybridge Suites with 122 projects/12,564 rooms.

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S. Hilton opened 45 new hotels/4,923 rooms accounting for 19% of newly opened rooms and IHG opened 25 new hotels in Q3/2,459 rooms accounting for 9% of rooms. Year-to-date, through the end of the third quarter in 2021, Marriott has opened 212 new hotels/28,298 rooms accounting for 32% of new hotels and 33% of new rooms; Hilton has opened 169 new hotels/21,786 rooms, accounting for 25% of new hotels and 26% of newly opened rooms, and IHG opened 98 new hotels/9,828 rooms, accounting for 15% of new hotels and 12% of rooms opened in the U.S.

The LE forecast for new hotel openings in 2021 anticipates that Marriott will open 243 projects/32,944 rooms by year-end. Hilton is expected to open a total of 207 projects/26,056 rooms in 2021, and IHG is on track to open 145 projects/14,451 rooms. In 2022, LE forecasts Marriott will open 245 new hotels/31,470 rooms, IHG will open 204 new hotels/20,737 rooms, and Hilton is expected to open 192 new hotels/22,090 rooms.

Related Stories

| Apr 28, 2014

Welcome to the Hive: OVA designs wild shipping container hotel for competition

Hong Kong-based OVA envisions a shipping-container hotel, where rooms could be removed at will and designed by advertisers.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 15, 2014

First look: Zaha Hadid reveals designs for dreamy sculptural hotel - CORRECTED

Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub, features a latticed exoskeleton enveloping the building's exterior. The 40-floor, 150,000-square-foot space is envisioned as a monolith with voids carved throughout. 

| Apr 11, 2014

Start your engines: Ferrari plans to build first ever hotel

Clad in the carmaker's signature "Ferrari red," the hotel will resemble the grill and hood of one of its iconic cars.

| Apr 9, 2014

5 important trends shaping today’s hotel construction market

AEC firms, developers, and investors worldwide are bullish on hotels. Our hospitality Giants share what’s new in this fast-morphing sector.

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Gehry, Foster unveil plans for Battersea Power Station redevelopment [slideshow]

Phase 3 of the massive redevelopment of the London landmark will include more than 1,300 residential units, a 160-room hotel, and 350,000 sf of retail space.

| Apr 8, 2014

First look: Zaha Hadid reveals design for dreamy sculptural hotel

Hadid's design, which will become the fifth hotel tower in the City of Dreams entertainment hub in Macau, features a latticed exoskeleton enveloping the building's exterior.  

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 27, 2014

16 kitchen and bath design trends for 2014

Work on multifamily housing projects? Here are the top kitchen and bath design trends, according to a survey of more than 420 kitchen and bath designers. 

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021