flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

Hotel Facilities

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S.


By Lodging Econometrics | October 28, 2021
Hotel room

Courtesy Pixabay

According to the third quarter report by analysts at Lodging Econometrics (LE), the franchise companies leading the U.S. construction pipeline with the greatest number of new construction projects are Marriott International with 1,286 projects/166,174 rooms, Hilton Worldwide with 1,223 projects/139,742 rooms, and InterContinental Hotels Group (IHG) with 769 projects/77,558 rooms. The construction pipelines for these three franchise companies comprise an impressive 68% of the total construction pipeline projects.

The leading brands by project count in the construction pipeline for each of these three companies are Hilton’s Home2 Suites by Hilton with 402 projects/41,846 rooms, IHG’s Holiday Inn Express with 301 projects/28,852 rooms, and Marriott’s Fairfield Inn with 246 projects/23,653 rooms. These three mid-market brands alone account for 20% of the projects in the total construction pipeline.

Other significant brands in the pipeline for these franchises include Hilton’s Hampton by Hilton, reaching a cyclical peak, with 271 projects/28,311 rooms and Tru by Hilton with 224 projects/21,518 rooms; Marriott’s TownePlace Suites with 204 projects/19,5693 rooms and Residence Inn with 203 projects/25,132 rooms; IHG’s Avid Hotel with 152 projects/13,255 rooms and Staybridge Suites with 122 projects/12,564 rooms.

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S. Hilton opened 45 new hotels/4,923 rooms accounting for 19% of newly opened rooms and IHG opened 25 new hotels in Q3/2,459 rooms accounting for 9% of rooms. Year-to-date, through the end of the third quarter in 2021, Marriott has opened 212 new hotels/28,298 rooms accounting for 32% of new hotels and 33% of new rooms; Hilton has opened 169 new hotels/21,786 rooms, accounting for 25% of new hotels and 26% of newly opened rooms, and IHG opened 98 new hotels/9,828 rooms, accounting for 15% of new hotels and 12% of rooms opened in the U.S.

The LE forecast for new hotel openings in 2021 anticipates that Marriott will open 243 projects/32,944 rooms by year-end. Hilton is expected to open a total of 207 projects/26,056 rooms in 2021, and IHG is on track to open 145 projects/14,451 rooms. In 2022, LE forecasts Marriott will open 245 new hotels/31,470 rooms, IHG will open 204 new hotels/20,737 rooms, and Hilton is expected to open 192 new hotels/22,090 rooms.

Related Stories

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 31, 2013

Hotel, retail sectors bright spots of sluggish nonresidential construction market

A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.

| Jul 22, 2013

Top Hotel Construction Firms [2013 Giants 300 Report]

Manhattan Construction, Structure Tone, Lend Lease top Building Design+Construction's 2013 ranking of the largest hotel contractors and construction management firms in the U.S.

| Jul 22, 2013

Top Hotel Engineering Firms [2013 Giants 300 Report]

AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.

| Jul 22, 2013

Top Hotel Architecture Firms [2013 Giants 300 Report]

Gensler, WATG, HKS top Building Design+Construction's 2013 ranking of the largest hotel architecture and architecture/engineering firms in the U.S.

| Jul 22, 2013

Hotel business continues to shine [2013 Giants 300 Report]

Despite some economic stressors, hotel operating fundamentals are poised to remain strong in 2013.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021