Marvel has recently completed the $18.1 million restoration and redesign of the El Yunque Visitor’s Center, "El Portal," located in the Puerto Rican municipality of Rio Grande. Commissioned by the USDA Forest Service, the project is part of the agency’s focus on strengthening the recreation offerings of El Yunque National Forest, The only tropical rainforest in the U.S. National Forest System.
The reconstruction included the addition of a new entry plaza and gardens that welcome visitors to the center. New passive ventilation was integrated at the exhibit, cafe, and multi-use pavilions, accomplished through new roof structures with clerestory windows and new shading structures. Additionally, a new cafe and a commercial and catering kitchen allow for more diverse uses to the Visitor’s Center.
Marvel also designed the only accessible trail in the entire National Forest as part of the project. New interpretative exhibits were designed by Split Rock Studios. The reception desk and interior signage at El Portal were custom-designed and built by Puerto Rico Hardwoods with recycled local mahogany boards from the forest.
After sustaining significant damages from Hurricane Maria, the Visitor’s center has been closed since 2017. The project began in the summer of 2019 and completed in December 2021. It officially reopened on January 20, 2022.
Related Stories
| Dec 10, 2011
10 Great Solutions
The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.
| Dec 10, 2011
Energy performance starts at the building envelope
Rainscreen system installed at the west building expansion of the University of Arizona’s Meinel Optical Sciences Center in Tucson, with its folded glass wall and copper-paneled, breathable cladding over precast concrete.
| Dec 8, 2011
Keast & Hood Co. part of Statue of Liberty renovation team
Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty.
| Dec 7, 2011
ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan
The facility's design highlights the inherent link between environmental consciousness and religious reverence.
| Dec 5, 2011
Summit Design+Build begins renovation of Chicago’s Esquire Theatre
The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.