flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance

Museums

Marvel selected for $21 million renovation of the Bronx Museum of Arts’ Grand Concourse Entrance

The museum is one of NYC’s only major museums with free admission.


By David Malone, Managing Editor | December 20, 2021
Bronx Museum of the Arts new entrance lobby
Courtesy Marvel

Marvel has been selected to design the renovation of a new multi-story entrance and lobby for the Bronx Museum of Arts.

The new renovation will integrate the South Wing into the existing extension, built in 2006, by creating a cohesive architectural whole and a reimagined and spacious lobby. The lobby will include seating, gathering space, and large street-facing walls for artwork. The relocation of the main entrance to the highly-visible corner of Grand Concourse and 165th Street will open up the museum and serve as an expansion of the sidewalk, offering multiple opportunities for art and public programming to be visible from the street.

“With this addition, the Museum will continue to be one of the most vibrant and welcoming spaces for all New Yorkers and visitors, now and in the future,” said Jonathan J. Marvel, Principal Architect, Marvel, in a release. “We are extremely gratified to be a part of this meaningful project, which spans the storied Grand Concourse and celebrates New York City’s rich legacy of cultural inclusion and diversity.”

The Bronx Museum project will be overseen by the New York City Economic Development Corporation. It is slated for completion in 2025.

Tags

Related Stories

University Buildings | Feb 18, 2022

On-campus performing arts centers and museums can be talent magnets for universities

Cultural facilities are changing the way prospective students and parents view higher education campuses.

Museums | Jan 25, 2022

Cooper Robertson selected to design master plan for Munson-Williams-Proctor Arts Institute

The project will seek public input regarding the campus master plan.

Museums | Jan 14, 2022

The Shedd Aquarium unveils its $500 million vision for the future

The project will prepare the aquarium for the next 100 years.

Museums | Dec 7, 2021

The Palo Alto Junior Museum and Zoo completes

CAW Architects designed the project.

Giants 400 | Nov 19, 2021

2021 Cultural Facilities Giants: Top architecture, engineering, and construction firms in the U.S. cultural facilities sector

Gensler, AECOM, Buro Happold, and Arup top BD+C's rankings of the nation's largest cultural facilities sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Museums | Nov 10, 2021

Tampa Museum of Art announces $65 million expansion

Weiss/Manfredi is designing the expansion and the renovation of the existing museum building.

Museums | Oct 29, 2021

Rowan University’s new fossil museum sits within an active dinosaur fossil dig

   Ennead Architects (Design Architect) together with KSS Architects (Architect of Record) are designing the project.

Museums | Oct 15, 2021

Kunsthaus Zürich extension opens to the public

David Chipperfield Architects Berlin designed the project.

Museums | Sep 27, 2021

The Academy Museum of Motion Pictures set to open on Sept. 30 in Los Angeles

Renzo Piano Building Workshop designed the project.

boombox1
boombox2
native1

More In Category

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021