Expansion is a concern on every project with large drywall runs. Expansion occurs for a variety of reasons, including humidity, temperature changes and building movement. Without the proper expansion product, cracking or drywall buckling can occur.
While Baker Triangle was building the Southwest Energy office building in Houston, they knew they would need expansion products due to the large building size and layout. In the Southwest Energy building, expansion joints were placed in the massive ceiling expanses. To accommodate the building design, Baker Triangle wanted to installed curved 093 expansion beads. In the past, the only option for curved expansion products were special order and especially expensive metal products. Facing a tight deadline, instead of waiting weeks for clunky metal 093 beads to arrive, Baker Triangle turned to Trim-Tex 093V Expansion. Trim-Tex 093V is manufactured from flexible vinyl and easily formed to match the curved ceiling reveal design in the Southwest Energy office building.
In addition to being flexible, Trim-Tex 093V features a full 3/8” in controlled movement, which is more than any other 093 product on the market. Once it is installed, architects and builders need not worry about expansion issues marring a beautiful structure. 093V also has tear off strips, allowing the the center expansion channel to remain mud free and the tear off helps create an overall sharper finished edge. Trim-Tex 093V is also designed to provide expansion control on either walls or ceilings, so regardless of the surface it can be protected from expansion problems. Like all Trim-Tex products, 093V never dents, rusts or acts as a source for mold growth, which reduces long-term building maintenance costs.
For more information, visit www.Trim-Tex.com
Related Stories
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.
| May 9, 2012
Construction Defect Symposium will examine strategies for reducing litigation costs
July event in Key West will target decision makers in the insurance and construction industries.
| May 8, 2012
WDMA and AAMA release window, door & skylight market studies
Historic data for 2006 through 2011 and forecast data for 2012 through 2015 are included in the report.
| May 8, 2012
Gensler & J.C. Anderson team for pro bono high school project in Chicago
City Year representatives came to Gensler for their assistance in the transformation of the organization’s offices within Orr Academy High School, which also serve as an academic and social gathering space for students and corps members.
| May 8, 2012
Skanska USA hires Zamrowski as senior project manager
In his new role at Skanska, Zamrowski will serve as the day-to-day on-site contact for select Pennsylvania-based projects during all phases of construction.
| May 8, 2012
Morgan/Harbour completes three projects at Columbia Centre
Projects completed on behalf of property owner, White Oak Realty Partners, LLC, Pearlmark Realty Partners, LLC and Angelo Gordon & Co.
| May 7, 2012
4 more trends in higher-education facilities
Our series on college buildings continues with a look at new classroom designs, flexible space, collaboration areas, and the evolving role of the university library.
| May 7, 2012
2012 BUILDING TEAM AWARDS: TD Ameritrade Park
The new stadium for the College World Series in Omaha combines big-league amenities within a traditional minor league atmosphere.
| May 7, 2012
2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital
A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.