McCarthy Building Companies, Inc., one of Southern California’s foremost construction companies in educational facilities, recently completed construction of a new $96.7 million high school for Los Angeles Unified School District (LAUSD). Located at 6100 South Central Avenue in Los Angeles, the new South Region High School No. 2 opened for instruction on September 7, 2011.
Built to relieve overcrowding at nearby John C. Fremont Senior High School, the new South Region High School No. 2 is a part of LAUSD’s $19.5 billion new school construction and modernization program to provide a safe and healthy neighborhood school on a traditional, two-semester calendar for every student.
“McCarthy’s ability to successfully address all changes and unforeseen challenges while adhering to the schedule was key to the project’s success,” said Moty Eisenberg, senior project manager, contract professional for LAUSD. “As a result of a collaborative effort by the entire project team, our new high school opened on schedule and is now providing the community with a state-of-the-art educational facility while relieving overcrowded conditions at other nearby schools.”
McCarthy served as general contractor for the project which entailed construction of a 220,000-sf high school on a 16.1 acre site with capacity for up to 2,000 students. The new school consists of eight two-and three-level buildings with 75 classrooms, an administrative office, performing arts/multi-purpose/practice gym, cafeteria and food services area, media center/library, a gym and locker rooms. McCarthy also built an outdoor lunch shelter as well as athletic facilities including football and softball fields and a track and field venue with a new rubberized synthetic track surface.
Designed by Leo A Daly of Los Angeles, the nine buildings are strategically positioned to provide a rectangular perimeter barrier around a centrally located courtyard/student gathering area. The high school is sectioned into four small learning communities.
Paul Buckely, principle for Leo A Daly said that each learning community is self-contained with classrooms and laboratory facilities in each building. The athletic, library and performing arts facilities are shared among the four communities. Each classroom has state-of-the-art A/V equipment and the ADA compliant science labs feature built-in casework, fume hoods, chemical resistant countertops, sinks, gas, power and high speed data connections. All buildings are type II steel construction with the exterior skin comprised of plaster, CMU veneer and metal panels.
Certified by the Collaborative for High Performing Schools (CHPS), the new South Regional High School boasts numerous environmentally friendly elements. Some of the project’s sustainable features include: energy efficient direct/indirect lighting with automatic lighting controls; low flow lavatories; low VOC paint; high energy efficient air conditioning; operable windows; a white roof to reflect unwanted energy and reduce the amount of energy consumed and drought tolerant landscaping. Construction waste was also recycled.
BIM (Building Information Modeling) technology was used to assist in the building process for the new high school. Xcel Mechanical Systems, the project’s mechanical contractor, used AutoDesk NavisWorks project review software to create 3D models of the high school’s mechanical systems before construction began. The use of 3D modeling proved highly successful in helping visualize and resolve systems clashes in the areas that required extensive detailing such as the central plant, the underground utilities, small mechanical closets and restrooms.
“LAUSD, Leo A Daly and McCarthy worked extremely well together,” said Senior Project Manager Andrew Raufi. “This close team collaboration allowed the project to stay ahead of schedule and complete nearly two months early despite several weeks of rain delays as well as scope additions for underground utilities, off-site street improvements and a new synthetic track and field toward the end of the project.”
Consultants for the new high school include civil engineer KPFF Consulting Engineers; electrical and mechanical engineer Donald F. Dickerson Associates; landscape architect Mia Lehrer & Associates and kitchen consultant Commercial Kitchen Design, Inc. BD+C
Related Stories
| Aug 11, 2010
SAFTI FIRST hires Tim Nass as National Sales Manager
SAFTI FIRST, a leading USA manufacturer of fire rated glazing and framing systems, is pleased to announce the addition of Tim Nass as National Sales Manager. In his new role, Tim will be working closely with architects and contract glaziers in selecting the appropriate and most economical fire rated glazing solution for their project. He will also be coordinating SAFTI FIRST’s extensive network of architectural representatives throughout the United States.
| Aug 11, 2010
NCARB welcomes new board of directors
The National Council of Architectural Registration Boards (NCARB) introduces its Board of Directors for FY10, who were installed during the culmination of the Council’s 90th Annual Meeting and Conference in Chicago.
| Aug 11, 2010
Berkebile wins $100K award for commitment to environment
Robert Berkebile, the founding principal of BNIM Architects and a founding member of the U.S. Green Building Council, has been selected to receive a $100,000 Heinz Award. The award honors his role in promoting green building design and for his commitment and action toward restoring social, economic, and environmental vitality to America’s communities through sustainable architecture and planning.
| Aug 11, 2010
Polshek Partnership unveils design for University of North Texas business building
New York-based architect Polshek Partnership today unveiled its design scheme for the $70 million Business Leadership Building at the University of North Texas in Denton. Designed to provide UNT’s 5,400-plus business majors the highest level of academic instruction and professional training, the 180,000-sf facility will include an open atrium, an internet café, and numerous study and tutoring rooms—all designed to help develop a spirit of collaboration and team-oriented focus.
| Aug 11, 2010
University of Florida aiming for nation’s first LEED Platinum parking garage
If all goes as planned, the University of Florida’s new $20 million Southwest Parking Garage Complex in Gainesville will soon become the first parking facility in the country to earn LEED Platinum status. Designed by the Boca Raton office of PGAL to meet criteria for the highest LEED certification category, the garage complex includes a six-level, 313,000-sf parking garage (927 spaces) and an attached, 10,000-sf, two-story transportation and parking services office building.
| Aug 11, 2010
Draft NIST report on Cowboys practice facility collapse released for public comment
A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).
| Aug 11, 2010
Callison, MulvannyG2 among nation's largest retail design firms, according to BD+C's Giants 300 report
A ranking of the Top 75 Retail Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants