flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

McGuire Engineers welcomes VP and Partner David P. Callan

McGuire Engineers welcomes VP and Partner David P. Callan

Callan to lead McGuire Engineers' High Performance Building's Practice


By McGuire Engineers | May 15, 2013

McGuire Engineers is pleased to announce that David P. Callan, PE, CEM, LEED AP, HBDP has joined the firm as vice president and partner. With over 17 years of experience, Callan leads the firm’s high performance buildings practice.

“David’s expertise in the design and analysis of building systems for high performance projects in the commercial, institutional, healthcare, mission critical, public, and federal markets is a tremendous asset to the company,” said Anthony McGuire, founder and principal of McGuire Engineers.

Prior to joining McGuire Engineers, Callan served as senior vice president and director of technical operations for Environmental Systems Design, Inc. located in Chicago, Ill. His career also includes senior positions at Syska Hennessy Group, Inc and Skidmore, Owings & Merrill LLP. Callan received a B.S. in Architectural Engineering from Drexel University and a M.S. in Construction Engineering and Management from the Illinois Institute of Technology. 

About McGuire Engineers
McGuire Engineers, Inc., (MEPC) founded in 1986, is a full service engineering firm based in Chicago, Ill. which provides engineering design and consulting services for both existing and new commercial, institutional and industrial buildings. MEPC is active in LEED-Certified and sustainable design projects and has LEED accredited professionals in every discipline with excellent performance records in LEED design, commissioning, energy modeling, energy audits and consulting. MEPC clients have trusted the firm with their finest art and most valuable assets, and the staff prides itself on developing innovative solutions that not only do the job, but save customers time and money.  Notable projects include the John Hancock Building, The Field Museum and the Art Institute of Chicago.  Visit www.mepcinc.com.

Related Stories

| Oct 2, 2013

Corporate HQ in 10 months made possible with BIM coordination

An integrated Building Team uses BIM/VDC to convert a 1940s-era industrial building into a flashy new headquarters for Hillshire Brands in a matter of months. 

| Oct 1, 2013

13 structural steel buildings that dazzle

The Barclays Center arena in Brooklyn and the NASCAR Hall of Fame in Charlotte, N.C., are among projects named 2013 IDEAS2 winners by the American Institute of Steel Construction.

| Oct 1, 2013

Federal government shutdown: What it means to AEC firms

The American Institute of Architects has issued a statement and FAQs document following the partial federal government shutdown that began early this morning.

| Oct 1, 2013

OSHA’s top 10 violations for 2013

Fall protection tops the list of the Occupational Safety and Health Administration’s most-cited workplace safety violations.

| Oct 1, 2013

Last chance! Three 'scholarships' left for BD+C Under40 Leadership Summit

Free registration for selected "young superstars" for BD+C's Under40 Leadership Summit in San Francisco, Oct 9-11, 2013

| Sep 30, 2013

Smart building systems key to new Wisconsin general aviation terminal’s net zero target

The Outagamie County Regional Airport’s new 8,000 sf general aviation terminal was designed to achieve net zero.

| Sep 27, 2013

NYC releases first year-to-year energy performance data on commercial properties

A new report provides information on energy performance of New York City's largest buildings (mostly commercial, multi-family residential). It provides an analysis of 2011 data from city-required energy “benchmarking”—or the tracking and comparison of energy performance—in more than 24,000 buildings that are over 50,000 square feet.

| Sep 27, 2013

ASHRAE/IES publish first standard focused on commissioning process

ANSI/ASHRAE/IES Standard 202, Commissioning Process for Buildings and Systems, identifies the minimum acceptable commissioning process for buildings and systems as described in ASHRAE’s Guideline 0-2005, The Commissioning Process. Standard 202 is ASHRAE’s first standard focused on the commissioning process.

| Sep 26, 2013

Sheep's wool insulation, bio-brick among Cradle to Cradle product innovation finalists

Ten finalists are competing for $250,000 in prizes from the Cradle to Cradle Products Innovation Institute and Make It Right.  

| Sep 26, 2013

6 ways to maximize home-field advantage in sports venue design

Home-field advantage can play a significant role in game outcomes. Here are ways AEC firms can help create the conditions that draw big crowds, energize the home team to perform better, and disrupt visiting players.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021