McGuire Engineers is pleased to announce that David P. Callan, PE, CEM, LEED AP, HBDP has joined the firm as vice president and partner. With over 17 years of experience, Callan leads the firm’s high performance buildings practice.
“David’s expertise in the design and analysis of building systems for high performance projects in the commercial, institutional, healthcare, mission critical, public, and federal markets is a tremendous asset to the company,” said Anthony McGuire, founder and principal of McGuire Engineers.
Prior to joining McGuire Engineers, Callan served as senior vice president and director of technical operations for Environmental Systems Design, Inc. located in Chicago, Ill. His career also includes senior positions at Syska Hennessy Group, Inc and Skidmore, Owings & Merrill LLP. Callan received a B.S. in Architectural Engineering from Drexel University and a M.S. in Construction Engineering and Management from the Illinois Institute of Technology.
About McGuire Engineers
McGuire Engineers, Inc., (MEPC) founded in 1986, is a full service engineering firm based in Chicago, Ill. which provides engineering design and consulting services for both existing and new commercial, institutional and industrial buildings. MEPC is active in LEED-Certified and sustainable design projects and has LEED accredited professionals in every discipline with excellent performance records in LEED design, commissioning, energy modeling, energy audits and consulting. MEPC clients have trusted the firm with their finest art and most valuable assets, and the staff prides itself on developing innovative solutions that not only do the job, but save customers time and money. Notable projects include the John Hancock Building, The Field Museum and the Art Institute of Chicago. Visit www.mepcinc.com.
Related Stories
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.
| Apr 6, 2013
Lord, Aeck & Sargent and Urban Collage merge
In a move that brings full-service planning expertise to its already well-established architecture practice, Lord, Aeck & Sargent (LAS) has merged with Urban Collage (UC), one of the largest urban and campus planning and design firms in the Southeast. Combining these firms’ talents was made official today. UC plans to retain its name for the foreseeable future.
| Apr 6, 2013
First look: GlaxoSmithKline's double LEED Platinum office
GlaxoSmithKline and Liberty Property Trust/Synterra Partners transform the work environment with the opening of Five Crescent Drive
| Apr 5, 2013
Bangkok gets a leaning tower, that may topple
A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.
| Apr 5, 2013
Snøhetta design creates groundbreaking high-tech library for NCSU
The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space.
| Apr 5, 2013
'My BIM journey' – 6 lessons from a BIM/VDC expert
Gensler's Jared Krieger offers important tips and advice for managing complex BIM/VDC-driven projects.
| Apr 5, 2013
Commercial greenhouse will top new Whole Foods store in Brooklyn
Whole Foods and partner Gotham Greens will create a 20,000-sf greenhouse atop one of the retailer's Brooklyn supermarkets. Expected to open this fall, the facility will supply produce to nine Whole Foods stores in metro New York City.
| Apr 5, 2013
Projected cost for Apple's Campus 2 balloons to $5 billion
Campus 2, Apple Inc.'s proposed ring-shaped office facility in Cupertino, Calif., could cost $5 billion to build, according to a report by Bloomberg.
| Apr 5, 2013
Extreme LEGO: Wondrous micro city built out of 200,000 blocks
Master LEGO builder Mike Doyle unveils his latest creation, an out-of-this-world micro city that celebrates peaceful alien contact.