McGuire Engineers is pleased to announce that David P. Callan, PE, CEM, LEED AP, HBDP has joined the firm as vice president and partner. With over 17 years of experience, Callan leads the firm’s high performance buildings practice.
“David’s expertise in the design and analysis of building systems for high performance projects in the commercial, institutional, healthcare, mission critical, public, and federal markets is a tremendous asset to the company,” said Anthony McGuire, founder and principal of McGuire Engineers.
Prior to joining McGuire Engineers, Callan served as senior vice president and director of technical operations for Environmental Systems Design, Inc. located in Chicago, Ill. His career also includes senior positions at Syska Hennessy Group, Inc and Skidmore, Owings & Merrill LLP. Callan received a B.S. in Architectural Engineering from Drexel University and a M.S. in Construction Engineering and Management from the Illinois Institute of Technology.
About McGuire Engineers
McGuire Engineers, Inc., (MEPC) founded in 1986, is a full service engineering firm based in Chicago, Ill. which provides engineering design and consulting services for both existing and new commercial, institutional and industrial buildings. MEPC is active in LEED-Certified and sustainable design projects and has LEED accredited professionals in every discipline with excellent performance records in LEED design, commissioning, energy modeling, energy audits and consulting. MEPC clients have trusted the firm with their finest art and most valuable assets, and the staff prides itself on developing innovative solutions that not only do the job, but save customers time and money. Notable projects include the John Hancock Building, The Field Museum and the Art Institute of Chicago. Visit www.mepcinc.com.
Related Stories
| Aug 14, 2012
SOM Foundation announces prize recipients for 2012
Submissions for the SOM Prize were received from students at 34 schools in the U.S.
| Aug 9, 2012
Slideshow: New renderings of 1 WTC
Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.
| Aug 9, 2012
Slideshow: New renderings of 1 WTC
Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.
| Aug 8, 2012
BD+C wins six B2B journalism awards
BD+C wins two national awards, three regional awards, and a regional Graphical Excellence award.
| Aug 8, 2012
BIM’s future up in the cloud
The AEC industry is on the cusp of a still more significant evolution with cloud computing.
| Aug 8, 2012
Giants 300 Sports Facilities Report
BD+C's Giants 300 Top 25 AEC Firms in the Sports Facilities sector.
| Aug 8, 2012
Giants 300 Science & Technology Report
BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.
| Aug 7, 2012
Pioneering revival
Financial setbacks didn’t stop this Building Team from transforming the country’s first women’s medical school into a new home for college students.
| Aug 7, 2012
Shedding light on the arts
Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.
| Aug 7, 2012
How to win more state and local government projects
With a huge building stock at their disposal, state and local governments can be attractive clients, especially in these difficult economic times.