flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

The aquarium is planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium.


By BD+C Staff | July 23, 2014

If you thought it would have never been possible for a multimillion-dollar project in Brazil to help create hundreds of jobs for Americans, think again, because it’s happening now.

The Acquario Ceará is a Brazilian public aquarium designed, engineered, financed, and currently under construction by multiple U.S. firms. The crustacean-shaped structure of steel and glass will stand along the Atlantic coast of the northeastern Brazilian city Fortaleza, designed with the hopes of being a new icon for South America.

The aquarium's intricate, exoskeleton-esque metalwork facade, designed by Imagic Brasil, the Latin American division of Cincinnati-based architect Jack Rouse Associates, will be fabricated by Kansas City, Mo.-based Zahner, whose portfolio includes two Gehry structures: the Pritzker Pavilion in Chicago and the Guggenheim Canopy in New York City.

According to The Atlantic’s CityLab, International Concept Management (ICM), a small business and custom aquarium maker in Grand Junction, Colorado, is overseeing construction of the project.

The aquarium, planned to be the third largest in the world after Georgia Aquarium and Dubai Mall aquarium, is set to open in 2015. According to the Kansas City Star, the aluminum support frame and aluminum skin plates that will cover it are currently being made in Zahner’s Midwestern fabrication shops, while the state of Ceará's governmental website indicates tubes and pipes are being made in Houston under ICM's supervision. Components will be shipped south to come together for the project.

But like many projects of its scale, the aquarium is not free of controversy. Brazilian critics say the aquarium is being built without transparency, CityLab reports. Moreover, the fact that such an expensive recreational facility is being built in one of Brazil’s poorest state’s is deemed as distasteful by some. 

In the U.S., critics are aimed at the project’s financial backing, which includes a $105 million direct loan from the taxpayer-funded federal export credit agency Export-Import Bank of the United States.

More on the project at CityLab.

Related Stories

| Nov 9, 2010

Designing a library? Don’t focus on books

How do you design a library when print books are no longer its core business? Turn them into massive study halls. That’s what designers did at the University of Amsterdam, where they transformed the existing 27,000-sf library into a study center—without any visible books. About 2,000 students visit the facility daily and encounter workspaces instead of stacks.

| Nov 9, 2010

Turner Construction report: Green buildings still on the agenda

Green buildings continue to be on the agenda for real estate owners, developers, and corporate owner-occupants, according to the Turner 2010 Green Building Market Barometer. Key findings: Almost 90% of respondents said it was extremely or very likely they would incorporate energy-efficiency improvements in their new construction or renovation project, and 60% expected to incorporate improvements to water efficiency, indoor environmental quality, and green materials.

| Nov 5, 2010

New Millennium’s Gary Heasley on BIM, LEED, and the nonresidential market

Gary Heasley, president of New Millennium Building Systems, Fort Wayne, Ind., and EVP of its parent company, Steel Dynamics, Inc., tells BD+C’s Robert Cassidy about the Steel Joist Manufacturer’s westward expansion, its push to create BIM tools for its products, LEED, and the outlook for the nonresidential construction market.

| Nov 3, 2010

First of three green labs opens at Iowa State University

Designed by ZGF Architects, in association with OPN Architects, the Biorenewable Research Laboratory on the Ames campus of Iowa State University is the first of three projects completed as part of the school’s Biorenewables Complex. The 71,800-sf LEED Gold project is one of three wings that will make up the 210,000-sf complex.

| Nov 3, 2010

Park’s green education center a lesson in sustainability

The new Cantigny Outdoor Education Center, located within the 500-acre Cantigny Park in Wheaton, Ill., earned LEED Silver. Designed by DLA Architects, the 3,100-sf multipurpose center will serve patrons of the park’s golf courses, museums, and display garden, one of the largest such gardens in the Midwest.

| Nov 3, 2010

Public works complex gets eco-friendly addition

The renovation and expansion of the public works operations facility in Wilmette, Ill., including a 5,000-sf addition that houses administrative and engineering offices, locker rooms, and a lunch room/meeting room, is seeking LEED Gold certification.

| Nov 3, 2010

Sailing center sets course for energy efficiency, sustainability

The Milwaukee (Wis.) Community Sailing Center’s new facility on Lake Michigan counts a geothermal heating and cooling system among its sustainable features. The facility was designed for the nonprofit instructional sailing organization with energy efficiency and low operating costs in mind.

| Nov 3, 2010

Seattle University’s expanded library trying for LEED Gold

Pfeiffer Partners Architects, in collaboration with Mithun Architects, programmed, planned, and designed the $55 million renovation and expansion of Lemieux Library and McGoldrick Learning Commons at Seattle University. The LEED-Gold-designed facility’s green features include daylighting, sustainable and recycled materials, and a rain garden.

| Nov 3, 2010

Recreation center targets student health, earns LEED Platinum

Not only is the student recreation center at the University of Arizona, Tucson, the hub of student life but its new 54,000-sf addition is also super-green, having recently attained LEED Platinum certification.

| Nov 3, 2010

New church in Connecticut will serve a growing congregation

Tocci Building Companies will start digging next June for the Black Rock Congregational Church in Fairfield, Conn. Designed by Wiles Architects, the 103,000-sf multiuse facility will feature a 900-person worship center with tiered stadium seating, a children’s worship center, a chapel, an auditorium, a gymnasium, educational space, administrative offices, commercial kitchen, and a welcome center with library and lounge.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021