Metal roof design tips: The devil is in the details

Metal roof design tips: The devil is in the details

This course is worth 1.0 AIA LU/HSW


By MBCI | October 30, 2013

In this AIA/CES-approved presentation, you will learn that designing a roofing system for long-term performance requires long-term thinking about the details incorporated in a metal roof system. This presentation provides information regarding proper design to prevent possible infiltration from the roof system into the building. It also works as a guide when designing a roof to allow for proper water runoff.

Learning objectives include:
• Requirements needed when designing details incorporated into a metal roof system.
• Being exposed to both correct and incorrect details and conditions that are best avoided when possible,
• Learning how roof penetrations should be specified and installed to provide long term weathertightness.
• Learning about dissimilar metals and how they affect a roof’s service life.

 

Take this free AIA/CES course at BDCUniversity.com

Related Stories

| Dec 4, 2012

MKK’s Denver Human Services Eastside Building wins ACEC Excellence Award

MKK provided mechanical, plumbing and fire protection consulting services on this LEED-NC Gold project.

| Dec 4, 2012

Thornton Tomasetti opens new office in São Paulo, Brazil

The move to São Paulo is strategic and timely, as the country continues preparations for the 2014 World Cup and 2016 Olympic Games in Rio de Janeiro.

| Dec 4, 2012

Greenhorne & O’Mara signs letter of intent to join Stantec

Acquisitions of C3TS and Architecture 2000 also completed.

| Dec 4, 2012

Sto Corp. announces new distributor in the Carolinas

Company will now have coverage in several parts of North Carolina.

| Dec 4, 2012

Wirtz Beverage Illinois’ corporate headquarters completed

WBI Center, a new state-of-the-art facility, is designed by Ware Malcomb.

| Dec 4, 2012

City of Gainesville to break ground on $33 million bus fleet maintenance and ops facility

The 140,000-sf facility will include dispatch, administrative and maintenance facilities.

| Nov 28, 2012

Project team to showcase design for first mixed-use retail center of its kind in Mexico City

Project reaching construction milestone, offering national model for urban development in Mexico.

| Nov 28, 2012

Cummins announces ratings classification for data center power systems

The Data Center Continuous ratings span the range of Cummins Power Generation’s high horsepower diesel generator sets, from 1 MW up to 2.5 MW, and will apply to both 50 Hz and 60 Hz configurations.

| Nov 28, 2012

Francis Cauffman appoints Stainbrook Director of Higher Education

Stainbrook has 16 years of experience as a strategic planner and urban designer working on complex projects on- and off-campus.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021