The Metal Construction Association (MCA) published a Best Practices Guide for Roof Seaming.
The document provides an overview of the different types of seaming for metal roofing, a glossary of terms, training guidelines, safety recommendations, pre- and post-seaming procedures, seaming operations, maintenance advice, and guides to sealants, clips, fasteners, and more.
“Proper seaming is critical to the long term performance of metal roofing and we saw a need to provide a general guide for installers that goes beyond what is provided by manufacturers,” says Scott Kriner, MCA’s Technical Director. This best practices guide is designed to familiarize personnel with the general knowledge, basic operation, safety, and maintenance procedures followed by standard troubleshooting suggestions for standard roof seaming processes. It is a general guide to be used in conjunction with the material installation guide and the project's erection drawings.
The guide is available on its website at no cost. It can be found here.
Related Stories
Codes and Standards | Dec 5, 2018
Canadian retailer builds net-zero stores
Other chains also boost green efforts with PVs, EV charging stations.
Codes and Standards | Dec 4, 2018
Action on building codes would spur low-carbon cities
Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.
Codes and Standards | Nov 30, 2018
Best solution to prevent California wildfire disasters: Stop building in places likely to burn
Approach would be unpopular as people attracted to stunning wooded landscapes.
Codes and Standards | Nov 29, 2018
USGBC and BRE form partnership
Two green standards groups will collaborate on standards, platforms, and research.
Codes and Standards | Nov 29, 2018
Parking garages in N.Y. State will have to be inspected every three years
Professional engineer must assess conditions.
Codes and Standards | Nov 28, 2018
To build water-efficient cities, water managers and urban planners must coordinate better
Lack of time and resources, and practitioners not in habit of working together hamper efforts.
Codes and Standards | Nov 27, 2018
AAMA updates specification for roller assemblies in sliding doors, and lift and slide doors
Last update was in 2015.
Codes and Standards | Nov 26, 2018
All LEED-certified buildings eligible for LEED recertification
Projects must submit 12 months of data demonstrating continued or improved performance.
Codes and Standards | Nov 20, 2018
OSHA publishes updates to crane operator certification requirements
Long-delayed rules accept certifications by type or type and capacity.
Codes and Standards | Nov 19, 2018
Guide offers understanding of elements that create successful multi-floor communal spaces
CTBUH technical document analyzes how to approach tall urban habitat.